External Connection
4.7.3.1 Order of Management Peripheral Cards
Because UPS signals are passed between management peripherals, you must install management peripheral cards in the correct order for them to work together properly. The card slots are numbered 1 to 3, from left to right, as viewed from the rear of the chassis. The following table lists the management peripheral cards, their priority, and proper position.
Management | P/N | Priority | Position | ||
Peripheral Card | |||||
|
|
|
| ||
|
|
|
|
| |
Web/SNMP Management | AP9606 | Highest | |||
Card |
|
| |||
|
|
|
| ||
|
|
|
|
| |
|
|
|
| ||
|
|
|
| ||
Management Card | AP9608 |
|
| ||
|
|
|
| ||
Interface Expander | AP9607 | Second lowest |
|
| |
|
|
|
|
| |
Environmental | AP9612T |
|
|
| |
Monitoring Card | Lowest |
|
| ||
AP9612TH |
|
| |||
| |||||
|
|
4.7.3.2 Installing Management Peripheral Cards
To install management peripherals, perform the following steps.
1)Make sure that the chassis is powered off.
2)Install management peripheral cards into the housings on the rear of the chassis. See the instructions supplied with the cards and the table above.
3)If you are
4)Power the APC Silcon Triple Chassis and all external management peripherals.
NOTICE!
If your configuration requires additional power, connect a 24V AC/DC power adapter available from APC (part number AP9505 or AP9505i) for all models of Triple Chassis.
4.7.3.3 Daisy-chaining the APC Silcon Triple Chassis
If you need more than the three card slots available with the APC Silcon Triple Chassis, or if you want to use other external management peripherals, you can
NOTICE!
When
Installation Guide APC Silcon | 23 |