Contents
1.0 | Introduction | 5 |
1.1 | Tools and Equipment | 5 |
2.0 | Unpacking | 6 |
3.0 | Installation | 7 |
3.1 | Requirements on Site | 7 |
3.1.1 | Cabinet Dimensions | 7 |
3.2 | Footprint | 8 |
3.2.1 | 1600mm Cabinet for | 8 |
3.2.2 | 825mm Cabinet for Isolation Transformer or Switch Gear | 8 |
3.2.3 | 1600mm Cabinet for Isolation Transformer | 8 |
4.0 | External Connection | 9 |
4.1 | Connecting the UPS | 9 |
4.2 | System Integration Interface | 11 |
4.2.1 | Connections | 12 |
4.3 | Parallel Board | 13 |
4.4 | Relay Board | 16 |
4.4.1 | Relay Board/Relay Functions | 17 |
4.5 | Communication Interface Board | 19 |
4.5.1 | Connections | 19 |
4.6 | Connecting of APC Silcon Tripel Chassis | 20 |
4.7 | APC Silcon Triple Chassis | 21 |
4.7.1 | Safety Warnings | 21 |
4.7.2 | Product Description | 21 |
4.7.3 | Installing Management Peripherals | 22 |
4.7.4 | Powering the APC Silcon Triple Chassis | 24 |
4.7.5 | Troubleshooting | 25 |
4.7.6 | Product Specifications | 26 |
4.8 | APC Silcon Battery Cabinets | 29 |
4.9 | Battery Breaker | 31 |
4.9.1 | Battery Breaker Box | 32 |
4.9.2 | APC Battery Breaker Box Connection Diagram | 33 |
4.9.3 | UPS with External Battery in Battery Breaker | 34 |
5.0 | Programming Parameters | 35 |
5.1 | Parameters | 35 |
5.1.1 | Programming Keys | 36 |
5.1.2 | Programming Example - Switch to Bypass Operation | 37 |
5.2 | System Configuration | 37 |
5.2.1 | Programming Example - Change Charge Voltage to 446 | 39 |
5.2.2 | Programming Example - Change to Output Isolation Transformer available | 40 |
5.3 | Programming Parameters for Advanced Parallel Operation | 41 |
5.3.1 | Description of Settings | 41 |
5.3.2 | Programming example | 42 |
5.4 | Battery Monitor | 42 |
5.4.1 | Installation of new batteries | 42 |
6.0 | Options/Accessories | 43 |
6.1 | Service Bypass Panel for Single Operation | 43 |
6.1.1 | Wiring up UPS with SBP in | 44 |
6.1.2 | Wiring up UPS with SBP in | 44 |
6.1.3 | Operating The External Service Bypass Switch | 45 |
6.2 | Service Bypass Panel for Parallel Redundant Operation | 47 |
6.2.1 | Two Parallel Systems with Service Bypass Panel | 48 |
6.2.2 | Parallel/Redundant Operation with Service Bypass Panel and |
|
| External Battery via MCCB | 49 |
6.2.3 | Operating External Service Bypass Switch for Parallel Systems | 50 |
6.2.4 | Isolating One UPS for Service/Maintenance | 54 |
6.2.5 | Switching Back to Normal Parallel/Redundant Operation | 55 |
|
| |
|
| |
Installation Guide APC Silcon | 3 |