External Connection

Terminal Blocks: X003/X004 (Anxiliary Contacts)

When switching Q001, Q002, Q010, Battery Breaker 1 or Battery Breaker 2 from “ON or 1” to “OFF or 0”, the anxiliary contact has to be open BEFORE the corresponding main contacts are opened. When switching Q001, Q002, Q010, Battery Breaker 1 or Battery Breaker 2 the opposite way from “OFF or 0” to “ON or 1”, the anxiliary contact has to close with a maximum delay of 0.5 seconds from the time the corresponding main contacts are closed.

This type of auxillary contact is called a “late make” contact. (This also means that it will “break early” when activated in opposite direction.)

This auxillary contact is also called “NORMALLY OPEN” (NO), because the auxillary contact will be open when the main contacts are open.

Please note that the above term “NORMALLY” has nothing to do with NORMAL UPS OPERATION MODE.

When switching Q003 from “OFF or 0” to “ON or 1”, the anxiliary contact has to open BEFORE the corresponding main contacts are closed. When switching Q003 the opposite way from “ON or 1” to “OFF or 0”, the auxillary contact has to close with a maximum delay of 0.5 seconds from the time when the corresponding main contacts are opened.

This type of anxiliary contact is called an “early break” contact. (This also means that it will “make late” when activated in the opposite direction.)

The auxiliary contact is also called “NORMALLY CLOSED” (NC), because the auxiliary contact will be closed when the main contacts are open.

Please note that the above term “NORMALLY” has nothing to do with NORMAL UPS OPERATION.

X005 (Output Relays)

Battery operation signals are received with a 30-second delay. This function is inactive during battery test. Common fault relay facility is programmable (standard factory setting: 10 sec.) See APC Silcon User Guide for details.

Maximum nominal voltage on contact circuits is 277VAC. If two different phases are involved, maximum phase to neutral voltage should be below 160VAC. Please note that phase L1 is already present on the System Integration Interface board, supplied from the Service Bypass Panel. Therefore, if a phase is needed for alarm or signal purposes, Phase L1 should be used.

4.3Parallel Board

CAUTION!

Control cables must be separated from AC and DC power cables.

Parallel Board

 

990-4045a

 

 

Installation Guide APC Silcon 240-320kW 400V UPS

13

Image 13
Contents APC Silcon 240-320kW 400V UPS Installation Guide Safety Symbols used in this manual Installation Guide APC Silcon 240-320kW 400V UPSThank You Contents Warranty System Specifications10.0 How to Contact APC AppendixIntroduction IntroductionTools and Equipment ToolsUnpacking UnpackingInstallation InstallationRequirements on Site Height mm Width mm Depth mmFootprint 2 825mm Cabinet for Isolation Transformer or Switch Gear1 1600mm Cabinet for 240-320kW UPS 3 1600mm Cabinet for Isolation TransformerExternal Connection Connecting the UPSExternal Connection Right side viewFuses Output240kW 320kWSystem Integration Interface Connections Terminal Blocks X003/X004 Anxiliary Contacts Parallel BoardX005 Output Relays Parallel BoardExternal Connection External Control Cables Power CablesRelays Relay BoardRelay Board/Relay Functions Relay Message Alarm-trigging Events NumberSee .2 System configuration Communication Interface Board Connecting of APC Silcon Tripel Chassis APC Silcon Triple Chassis Safety WarningsProduct Description Monitoring PortInstalling Management Peripherals Optional Power InputLEDs If the LED is… Then the Silcon Triple Chassis…Order of Management Peripheral Cards Installing Management Peripheral CardsManagement Priority Position Peripheral Card Daisy-chaining the APC Silcon Triple ChassisManagement Peripheral Draw mA Problem Possible Cause Solution TroubleshootingIf Problems Persist Product Specifications Monitoring Port Pin Assignments External Connection Physical Power, Physical, and Environmental SpecificationsEnvironmental Important Safety Instructions APC Silcon Battery CabinetsDiagram UPS with Battery Cabinet Installation of BatteriesSilcon Battery Breaker Box/Fuse-box Ampere Connection Max Dimensions Weight Rating Cable Short Battery Breaker BoxCircuit Current kA 240 kW 320 kWAPC Battery Breaker Box Connection Diagram External Connection Programming Parameters Parameter Setting CommentsProgramming Parameters ParametersProgramming Keys Programming Example Switch to Bypass Operation System ConfigurationSystem Configuration Parameters password protected Programming Example Change Charge Voltage to Change parameters by pressing Programming Parameters for Advanced Parallel Operation Description of SettingsProgramming example Battery MonitorOptions/Accessories Options/AccessoriesService Bypass Panel for Single Operation Options/Accessories Display shows Operating The External Service Bypass SwitchLamp indication On Servive Bypass Panel Switching from External Bypass to Normal UPS OperationService Bypass Panel for Parallel Redundant Operation Two Parallel Systems with Service Bypass Panel Options/Accessories H002a Action Options/Accessories Action Lamp indication On Service Bypass PanelDisplay shows Following can be carried out on any UPS Isolating One UPS for Service/MaintenanceSwitching Back to Normal Parallel/Redundant Operation Intersystem Synchronization Unit System ISU System Intersystem Synchronization UnitIntersystem Synchronization Unit ISU Extension of Remote Display Communication Distance Remote DisplayStandard Short-haul RS232 Modem Async Host DTE Remote Display DTE Connections Without ConverterConnections With Converter Pin Connections for cable from host to ME800A-R2 HostRemote Display Cables Remote Display Power SupplyRemote Display Setting Communication FaultAlarms Remote Display UseIsolation Transformer Height mm Width mm Depth mm Weight kgExternal External PE Input Fuses Input Cable Connecting Isolation TransformerFM a 120 DIN gL typesOptions/Accessories Isolation External External PE Cable mm2 SignalInput Input Cable Output Temp Fuses* FM 150 185Options/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories System Specifications System SpecificationsTechnical Data Dimensions / WeightWarranty WarrantyAPC Silcon Series Limited Factory Warranty Appendix Installation Planning DataAppendix Appendix How to Contact APC How to Contact APCAPC Corporate Fairgrounds Road West Kingston, RI APC Denmark Silcon Allé DK-6000 Kolding