INSTALLATION (continued)

Functional Test

The Functional Test consists of three checks: manual operation, voltage checks, and electrical operation.

NOTICE

Do these checks in the order presented to avoid damaging the automatic transfer switching equipment.

Read all instructions on the Wiring Diagrams and labels affixed to the ATS. Note the control features that are provided and review their operation before proceeding.

1 – Manual Operation

A detachable manual operator handle is provided on the Transfer Switching device for maintenance purposes only. Manual operation of the transfer switching device must be checked before it is operated electrically.

Do not manually operate the transfer switching device until both power sources are disconnected: open both circuit breakers.

Position of the transfer switch is indicated here

weight marked N (normal) and E (emergency)

maintenance handle

weight

floating weight

With ALL POWER OFF grasp maintenance handle and turn it quickly with your thumb and fingers.

1.After deenergizing both power sources, open the enclosure door. Locate and the maintenance handle on the left side of the transfer switching device. See Figure 1–6.

2.Grasp the attached maintenance handle and turn it with thumb and fingers as shown to manually operate it. The maintenance handle turns the opposite direction of the weight. Turn it up or down as shown to manually operate the transfer switching device. It should operate smoothly without any binding. If it does not, check for shipping damage or construction debris.

3.Return the transfer switching device to the N (normal) position.

Figure 1-6. Maintenance handle and positions.

Now continue to 2 – Voltage Checks on next page.

1--3

Image 5
Contents Nameplate / rating Label Operator’s Manual200 a Catalog Number IdentificationGrounding InstallationMounting Power connections InstallationInterconnecting harness Engine Starting ContactsManual Operation Installation Functional TestVoltage Checks Electrical Operation Transfer To Emergency Sequence of OperationDisconnecting the Controller Testing & ServicePreventive Maintenance TROUBLE-SHOOTING Testing & ServiceManual Load Transfer Check in Numerical SequenceTime Delay Adjustment AdjustmentsSensor Adjustments Time Delay SettingsHow to Change a Setting AdjustmentsSwitches SW3 actuator On each DIP switch Off onDIP Switch Settings Control Features Engine ExercisersHow to Set Built-In Timer BUILT-IN Engine ExerciserOptional Programmable Engine Exerciser Accessory 11CD Control FeaturesCanceling Time Programs Setting the Clock Time and DayProgramming Engine On-Off Periods Changing or Checking Time ProgramsLoad Disconnect Feature Remote Control FeaturesInphase Monitor For Motor Load Transfer Page Index