Liebert SERIES 300 UPS manual Alarm History Press To access, Lamp Test

Page 52

3.5.3

Alarm History

 

 

 

7KHý6HULHVýêííý836ýLVýHTXLSSHGýZLWKýDýGDWDýEXIIHUýWKDWýUHFRUGVýDFWLYHý$ODUPý0HVVDJHVýRYHUýDý

 

SHULRGýRIýWLPHïý7RýYLHZýWKHý$ODUPý+LVWRU\ýRIýWKHý836ñýSUHVVýWKHý'RZQýSDGýXQWLOýWKHýIROORZLQJý

 

VFUHHQýDSSHDUVãý

 

 

 

Alarm History

 

 

Press

ý

 

to access

 

 

 

3UHVVýWKHý$ODUPý6LOHQFHýSDGýWRýDFFHVVýWKHý$ODUPý+LVWRU\ýVFUHHQïý3UHVVýWKHý'RZQýSDGýWRýYLHZýWKHý

 

$ODUPý0HVVDJHVï

 

 

 

7KHý$ODUPý0HVVDJHVýDUHýGLVSOD\HGýLQýWKHýUHYHUVHýRUGHUýRIýRFFXUUHQFHýõEHJLQQLQJýZLWKýWKHýPRVWý

 

UHFHQWôïý7KHýWLPHýõWRýWKHýíïìýVHFRQGôýDQGýGDWHýRIýRFFXUUHQFHýLVýGLVSOD\HGýZLWKýHDFKý$ODUPý0HVVDJHïý

 

)RUýDýOLVWýRIý$ODUPý0HVVDJHVýZLWKýGHVFULSWLRQVýDQGýUHFRPPHQGHGýFRUUHFWLYHýDFWLRQVñýUHIHUýWRýêïìì ðý

 

$ODUPý0HVVDJHVï

 

 

3.5.4

Lamp Test

 

 

 

3HULRGLFDOO\ñýWKHýRSHUDWRUýVKRXOGýYHULI\ýWKDWýDOOýVHJPHQWVýLQýWKHý/&'ýGLVSOD\ýVFUHHQýDUHýIXQFWLRQð

 

LQJï

 

 

 

)URPýWKHý1250$/ý23(5$7,21ýGHIDXOWýVFUHHQñýSUHVVýWKHý8SýSDGýRUñýSUHVVýWKHý'RZQýSDGýIURPý

 

WKHý$ODUPý+LVWRU\ýVFUHHQï

 

 

 

$OOý/('VýLOOXPLQDWHýIRUýDSSUR[LPDWHO\ýëýVHFRQGVýDQGýWKHýKRUQýVRXQGVïý7KHý,QSXWýDQGý2XWSXWý

 

/('VýRQýWKHý3RZHUý6WDWXVý'LDJUDPýDUHýGLUHFWO\ýZLUHGýWRýWKHLUýUHVSHFWLYHýSRZHUýOLQHVýDQGýDUHýQRWý

 

LQFOXGHGýLQýWKLVýWHVWïý:KHQýWKHýWHVWýLVýFRPSOHWHñýWKHýVFUHHQýZLOOýDXWRPDWLFDOO\ýGLVSOD\ýWKHýDSSURð

 

SULDWHýGHIDXOWýVFUHHQýPHVVDJHï

 

 

127(

1RWHýDQ\ý/('VýQRWýLOOXPLQDWHGïý&RQWDFWý/LHEHUWý&XVWRPHUý6HUYLFHýDQGý

6XSSRUWýDWýìðåííðèéêðëêæåýWRýPDNHýDSSURSULDWHýUHSDLUVï

46 Operation

Image 52
Contents Series 300 UPS Page Table of Contents Êïéïì ÊïéïëÊïèïì ÊïèïëÈïçïì ÈïçïëÈïçïê ÈïçïéLJXUHýì LJXUHýëLJXUHýê LJXUHýéImportant Safety Instructions PDLQWHQDQFHýRIý\RXUý6HULHVýêííý836ýDQGýEDWWHULHVï $ $51,1Page $87,21 PRVWýVLJQLILFDQWýFDXVHýRIýVWDUWðXSýSUREOHPVï$51,1 +$/ý92/7$*6ý,67ý,7+,1ý7+,6ý48,3017ý85,1*ýDefinitions Static Transfer Switch Maintenance Bypass LineExternal Maintenance Bypass Cabinet Static Bypass LineModes of Operation Through the UPS ModuleHFHVVýPRLVWXUHñýRUýGHEULVï Safety PrecautionsVXSSRUWLQJýWKHýORDGï Site Planning Data, Series 300 UPS, 10 to 50 kVA Site Planning Data, Series 300 UPS, 65 to 125 kVA Installation Considerations UPS Installation$ &$87,21 Unloading and External Inspection Internal Inspection of the UPS SystemEquipment Location YHUWLFDOýDWýDOOýWLPHVïBattery Installation Battery Safety PrecautionsMatching Battery Cabinets IHHWýDQGýUHPRYHýVXSSRUWLQJýGHYLFHïNon-Standard Batteries UPS Wire Size Guidelines Electrical WiringPower and Control Wiring Battery Wiring WKHý%DWWHU\ý&DELQHWýWRýWKHýDVVRFLDWHGý836ïÕZKHQýQHHGHGôï UHVXOWïCopper Aluminum or Copper-Clad Aluminum Connection Type / Wire Size Range Wiring Connections Wiring InspectionSingle Line Diagram 10-125 kVA Installation UPS Cabinet Installation Diagram 10-30 kVA UPS Cabinet Installation Diagram 40-50 kVA UPS Cabinet Installation Diagram 65-125 kVA Battery Cabinet Installation Diagram 22-inch Frame Battery Cabinet Installation Diagram 36-inch Frame Battery Cabinet Installation Diagram 36-inch Frame Control Wiring Diagram 10-30 kVA Control Wiring Diagram 40-50 kVA Control Wiring Diagram 65-125 kVA Field Wiring Terminations Field Wiring Terminations Operator Controls and Indicators Digital Display ScreenBlock Diagram of the Series 300 UPS Power Status Diagram Selection PadsRotary Switch Advisory Display\SDVVý/LQHï RSHUDWLRQïDisplay Screen Menu Menu Selection ArrangementDefault Screen Messages On MaintenanceNormal Operation Load on UPS Load XXX%Load on Static Switch Fault System ShutdownUPS on Battery Time Remaining XX MinutesUPS Response to an Alarm Alarm MessagesOperator Response to an Alarm Load XXX% a Phase XXX kVA B Phase XXX kVA C Phase XXX kVA System Status ScreensVoltage 410 Amps Charging 60.0 HzPress Review System Options Configuration Deutsche English Espanol Francais Italia Press To setRating Output Voltage RatingLow Battery NominalInput / Output Press To setAuto Battery Press To view or setMON APR 15 Time and DateAuto Restart ODWHUïAlarm History Alarm History Press To accessLamp Test Start-Up Start-Up ProcedureStart-Up from Position Power Testing chargerTesting inverter Press Button To start systemRotary switch to Testing batteryTesting static PositionTesting Input SynchronizationSRZHUýWRýWKHýFULWLFDOýORDGï WKHýORDGïý7KHýIROORZLQJýGHIDXOWýPHVVDJHýZLOOýDSSHDUãýAbnormal Conditions During Start-Up IýWKHýV\VWHPýGHWHFWVýDQýDEQRUPDOýFRQGLWLRQýGXULQJýVWDUWðXSãImproperly Operated Response to an Incorrect Start-Up SequenceFULWLFDOýORDGï RLQJýVRýZLOOýFDXVHýDQýLPPHGLDWHýORVVýRIýSRZHUýWRýWKHýORDGïNormal Operation Shutdown Please turnResponse to a Power Failure Calculating Time RemainingUPS Response VXSSO\ýSRZHUýWRýWKHýLQYHUWHUýZKLFKýVXSSRUWVýWKHýORDGïAs Battery Time Approaches Zero Operator ResponseOn Static Switch Response to a UPS Failure$QýDXGLEOHýDODUPýZLOOýVRXQGï WKHýFULWLFDOýORDGýWKURXJKýWKHý0DLQWHQDQFHý%\SDVVý/LQHïAlarm Messages UPS System Cooling Maintenance Steps To Take When To CallIýDQ\ýRIýWKHýDERYHýRFFXUã Preventive Maintenance Maintaining an Operator’s LogChanging the Air Filter Periodic Restart of the UPSMaintaining the Battery $957,66017 6ý3,&6ý6286ý$/,017$7,21ý65217ý/$,666ý6$16ý3527&7,21ý85$17ý&6ý352&856ýª1757,1ïý81ý 356211/ý48$/,,ý67ý548,6ý3285ý&785ý&6ýREVHUYpHVã Battery Voltage VDC PDQXDOïý $ &$87,21 Ìï HDUýIXOOýH\HýSURWHFWLRQýDQGýSURWHFWLYHýFORWKLQJïLiebert Customer Service and Support Maintenance AgreementsProfessional Start-up TrainingOptional External Maintenance Bypass Cabinet Installation Location ConsiderationsGeneral FDQQRWýEHýLQVWDOOHGýVHSDUDWHO\ýIURPýWKHý836ýPRGXOHïElectrical Wiring 127 5HIHUýWRýëïéïì ðý836ýLUHý6LHý*XLGHOLQHVïOperation Control Rotary Switch 7KHýWKUHHý5RWDU\ý6ZLWFKýSRVLWLRQVýDUHãFRQGLWLRQýKDVýEHHQýFRUUHFWHGï GLWLRQýRFFXUVïShutdown to Maintenance Position Optional Slim-Line Distribution Optional Remote Status PanelOptional Remote Contact Board RSWLRQýZKHQýDýUHPRWHýVWDWXVýSDQHOýRSWLRQýLVýSURYLGHGïUsing a Terminal as a Remote Station Optional RS-232 Interface PortRemote Front Panel Terminal Mode Key DescriptionSetting the Password PasswordEmerson Standard Protocol ESP Remote Load ControlWXUQýWKHýORDGýRQýRUýRIIýDWýZLOOï Using an Snmp Adapter OptionalPHQWDWLRQýVXSSOLHGýVHSDUDWHO\ï Modem Mode OFF Optional Internal ModemIncoming Calls Using the ModemOutgoing Calls 91000-000-0000 Pager Disabled000*000*000**?# DQýHYHQWýRFFXUVïý Calling a ModemVLEOHýZKHQýLWýFDOOVýDýSDJHUýVHUYLFHýQXPEHUï Üýíýìýëýêýéýèýçýæýåýäýðýõýôýñýúýý5ý7ý3ý#ýóýâý Editing the Phone NumbersWLRQã Testing the Dial-Out Setup Setting the Data RateDial Test OFF Last AttemptsOptional IBM AS/400 Signal Interface Optional SiteScan /Sitemaster Interface\RXýDUHýSUHSDUHGï ÌëííïOptional System/38 Power Warning Signal Optional Battery Circuit BreakerOptional DC Ground Fault Alarm Optional Contact Isolator BoardOptional Multi-Computer Interface System Optional IBM AS/400 Multi-Interface SystemOptional Maintenance Bypass Cabinet System Options Optional Slim-Line Distribution Optional Slim-Line Distribution Optional Remote Status Panel Optional Remote Contact Board Optional IBM AS/400 Signal Interface System Options Optional Battery Circuit Breaker 10-75 kVA Optional Battery Circuit Breaker 100-125 kVA Optional Computer Interface System Optional Multi-Computer Interface System Optional IBM AS/400 Multi-Interface System Electrical Specifications AC Inputs to UPSAC Output. UPS Inverter DXOWý&OHDULQJãý 6XEýF\FOHýFXUUHQWýRIýDWýOHDVWýêííøEnvironmental Specifications Mechanical SpecificationsRatings 7HPSHUDWXUHý5DQJHã ‡ 2SHUDWLQJãBattery DWWHU\ý7\SHãý6HDOHGñýOHDGðDFLGñýLQýPDWFKLQJýFDELQHWýýSpecifications XVWRPHUý5HVSRQVHý&HQWHUï SDFNDJHï5HYLVHGãý-XO\ýìääæ