THE
February 2007
Make a note of the large number you see in the center of the screen. Badger CONNECT will ask you about this number during the load function.
In Badger CONNECT, choose the Unload Collector page for the
Steps 2 and 3 on the Unload Collector page remain the same. Verify that the readings are correct by Viewing Unloaded Reading and then save reading by Uploading Accounts.
Route Information
If you wish to view information about the meters that are currently loaded, from the Route Transfer screen press the Route Info “I” button.
Page 16 of 73