C H A P T E R
2
Preparing to Install Xserve RAID in a Rack
Before you install the system in a rack, carefully consider the placement of the unit in its rack and several other factors in the infrastructure that will keep the system operating efficiently.
Guidelines for Installation
To ensure safe and smooth operation of your Xserve RAID system, it’s essential that you choose an appropriate location for the system in its rack, and provide an appropriate operating environment and adequate power for all components in the rack. In addition, the system requires special handling because of its weight.
As you plan for installation, follow these guidelines to ensure that the system and its environment are safely and appropriately positioned for efficient operation and service.
Precautions for Handling the System
When configured with a full set of drive modules, the system weighs approximately 100 pounds. Take the following precautions to avoid problems or potential injury as you handle the Xserve RAID system.
mNever try to unpack, lift, or carry the system by yourself. Always have another person available to help move or lift it.
mPrepare a flat, sturdy surface before removing the system from its packaging. The table or cart that will hold the system should be as close as possible to the system’s carton.
mBoth people should follow these guidelines to lift or move the system: m Stand with your legs
m Breathe deeply and tighten your stomach muscles to increase support for lifting. m Bend at your hips and knees, not at your waist.
m Use your leg muscles to lift.
19