Peerless Industries UST-WallArm3 manual Projector Cables Front of Projector

Page 11

Installation using Wall Arm Bracket and Extension Bracket

11 Attach exposed M5 x 20 mm socket pin serrated washer head screws (R) into top of adapter plate assembly (A) through slot in extension bracket (B) and keyholes in projector attachment bracket (H) as shown in detail 5.

Slide projector attachment bracket (H) toward wall. Once in locked position tighten all three M5 x 20 mm socket pin serrated washer head screws (R) using security wrench (Q) as shown in detail 6.

Secure extension bracket (B) into wall arm bracket (C) and secure using four M5 x 10 mm socket pin screws (T) using security wrench (Q) in desired position. NOTE: Make sure that four M5 x 10 mm socket pin screws (T) are used.

H

B

T

A

FRONT OF PROJECTOR

NOTE: Verify that all screws are in the center of the slot.

R

FRONT OF PROJECTOR

DETAIL 5

TIGHTEN

SCREWS

R

FRONT OF PROJECTOR

DETAIL 6

12 Route projector cables as shown. Use two cable management brackets (G) as needed.

Fasten two M5 x 20 mm socket pin serrated washer head screws (R) into top of adapter plate assembly (A).

B G

PROJECTOR CABLES

C

R

FRONT OF PROJECTOR

11 of 14

ISSUED:07-25-11 SHEET #: 125-9225-1

Image 11
Contents Dukane Projector Short Throw Wall ARM Table of Contents Tools Needed for AssemblyCDE Screen Active Image Wall Plate LocationInstallation to Single Wood Stud Wall Installation to Solid Concrete or Cinder Block Remove knobs and M10 washers from top AR H Projector Position for 60 70 Screen Size Installation using Wall Arm BracketProjector Position for 70 100 Screen Size Installation using Wall Arm Bracket and Extension BracketProjector Cables Front of Projector Pitch Adjustment Roll AdjustmentCombination for Pitch and Roll Rotation Swivel AdjustmentSecure wall plate cover E to wall arm bracket C using two