Peerless Industries UST-WallArm3 manual Projector Position for 60 70 Screen Size

Page 9

PROJECTOR POSITION FOR 60" - 70" SCREEN SIZE

SKIP TO PAGE 9 IF MOUNTING WITH 70" - 100" SCREEN SIZE

Installation using Wall Arm Bracket

9

Attach exposed M5 x 20 mm socket pin serrated washer head screws (R) on top of adapter plate assembly (A)

 

through slot in wall arm bracket (C) and keyholes in projector attachment bracket (H) as shown in detail 1.

Slide projector attachment bracket (H) toward wall. Once in locked position tighten all three M5 x 20 mm socket pin serrated washer head screws (R) using security wrench (Q) as shown in detail 2.

H

R

NOTE: Verify that all screws

 

are in the center of the slot.

 

FRONT OF PROJECTOR

FRONT OF PROJECTOR

DETAIL 1

 

TIGHTEN

SCREWS

FRONT OF PROJECTOR

DETAIL 2

10

Secure wall arm cap (S) into wall arm bracket (C) using two #8 x 3/8" sheet metal screws (N).

 

Route projector cables as shown. Use two cable management brackets (G) as needed.

 

NOTE: #8 x 3/8" sheet metal screws (N) will be shortened for production.

 

Fasten two M5 x 20 mm socket pin serrated washer head screws (R) into top of adapter plate assembly (A).

 

SKIP TO PAGE 11.

G

 

PROJECTOR CABLES

S

R

N

9 of 14

ISSUED:07-25-11 SHEET #: 125-9225-1

Image 9
Contents Dukane Projector Short Throw Wall ARM Table of Contents Tools Needed for AssemblyCDE Screen Active Image Wall Plate LocationInstallation to Single Wood Stud Wall Installation to Solid Concrete or Cinder Block Remove knobs and M10 washers from top AR H Projector Position for 60 70 Screen Size Installation using Wall Arm BracketProjector Position for 70 100 Screen Size Installation using Wall Arm Bracket and Extension BracketProjector Cables Front of Projector Pitch Adjustment Roll AdjustmentCombination for Pitch and Roll Rotation Swivel AdjustmentSecure wall plate cover E to wall arm bracket C using two