Peerless Industries UST-WallArm3 manual Wall Plate Location, Screen Active Image

Page 4

Wall Plate Location

1

Determine and mark the top edge of the

screen active image.

NOTE: Make sure to leave adequate space above the top edge of the active image for the wall arm and projector to be installed. Approximate dimension (23.0")

Using your mark for the top edge of active image determine dimension B to locate the bottom wall plate (D) mounting hole.

A = Board size / diagonal active image size

B = Distance from the top edge of the active image to the bottom mounting hole of wall plate (D).

C = Distance from the top edge of the active image to the bottom edge of wall plate (D).

SCREEN ACTIVE IMAGE

MANUFACTURER

MODEL

A

B

C

Hitachi Starboard

Trio 88

88

13.90

11.90

Hitachi Starboard

Trio 77

77

11.68

9.68

Mimio

HD90

88

13.90

11.90

Mimio

Board 80

78

11.82

9.82

Mimio

Board 100

98

14.60

12.60

Polyvision/ENO

TS620

77.8

11.79

9.79

Polyvision/ENO

TSL620

77.8

11.79

9.79

Polyvision/ENO

2610

78

11.82

9.82

Polyvision/ENO

2650

75‐16:10

12.00

10.00

Polyvision/ENO

2650

75‐4:3

11.40

9.40

Polyvision/ENO

2810

96

15.10

13.10

Polyvision/ENO

2850

93‐16:10

14.65

12.65

Polyvision/ENO

2850

93‐4:3

13.85

11.85

Promethean

587 Pro

87

13.75

11.75

Promethean

387

87

13.75

11.75

Promethean

387 Pro

87

13.75

11.75

Promethean

595 Pro

95

14.95

12.95

Promethean

395

95

14.95

12.95

Promethean

395 Pro

95

14.95

12.95

Promethean

164

64

9.86

7.86

Promethean

378

78

11.82

9.82

Promethean

378 Pro

78

11.82

9.82

Promethean

178

78

11.82

9.82

Smart

885

87

13.75

11.75

Smart

685

87.13

13.76

11.76

Smart

690

94

14.80

12.80

Smart

660

64

9.86

7.86

Smart

880

77

11.68

9.68

Smart

680

77

11.68

9.68

BOTTOM

D

AMOUNT OF VERTICAL ADJUSTMENT

PROJECTOR MIRROR

MOUNTING HOLE

 

2.0"

8.9"

 

 

7.5"

BC

TOP OF ACTIVE IMAGE

.7

.7

A

SCREEN CENTER

BOARD THICKNESS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4 of 14

ISSUED:07-25-11 SHEET #: 125-9225-1

 

 

 

 

 

 

 

 

Image 4
Contents Dukane Projector Short Throw Wall ARM Tools Needed for Assembly Table of ContentsCDE Wall Plate Location Screen Active ImageInstallation to Single Wood Stud Wall Installation to Solid Concrete or Cinder Block Remove knobs and M10 washers from top AR H Installation using Wall Arm Bracket Projector Position for 60 70 Screen SizeInstallation using Wall Arm Bracket and Extension Bracket Projector Position for 70 100 Screen SizeProjector Cables Front of Projector Roll Adjustment Pitch AdjustmentSwivel Adjustment Combination for Pitch and Roll RotationSecure wall plate cover E to wall arm bracket C using two