Predicting performance based upon signal quality varies with each loop. Generally, a noise margin of 0 or higher will support a bit error rate (BER) of better than 10-7. The following guidelines correspond to the operation of the LTU faceplate LEDs labeled LP1 and LP2. See Table 3.

Table 3. LP1 and LP2 Guidellines

Margin

Color

Quality

 

 

 

Margin < 0

Red

Poor Loop Quality

 

 

 

0 < Margin < 2

Yellow

Marginal Loop Quality

 

 

 

Margin > 2

Green

Good Loop Quality

 

 

 

Figure 15 and Figure 16 depict the HDSL Alarms and Test Screens. Current alarm conditions are displayed on the Alarms Screen, while a self test or loopbacks may be initiated or terminated using the Test Screen.

Shelf: 1 Slot: 5

 

Total Access System

 

04/07/01 09:16

Unacknowledged Alarms:

 

 

MAJOR MINOR

 

 

 

Circuit ID:

 

 

 

 

 

 

 

 

 

 

 

Alarms

 

 

 

 

 

NO ALARM CONDITIONS

 

 

_____

 

 

_____

 

_____

 

_____

LTU

REG 1

REG 2

NTU

--->

<===>

<===>

<===>

<—-

NET

CUST

<---

<===>

<===>

<===>

—>

_____

_____

_____

_____

‘?’ - System Help Screen

Figure 15. Alarms Screen

12

Section 61182007L1-5, Issue 1

61182007L1-5A

Image 12
Contents Adtran Total Access 3010 LTU GeneralInstallation Revision HistoryPowering Options LTU Alarm OutputsFaceplate Indicators Faceplate LED IndicatorsHdsl System Testing Display Off Mode SCU Control Port Operation HdslFront Panel Menus Screen AbbreviationsMajor Minor Info Major MinorAccess Module Menus Screen LTU NTU REG1 REG2 CAS CRC4HDB3 HDB3 Enabled CRC4 LTU E1CAS HDB3 CFMNo Alarm Conditions LTU REG NTU LP1 and LP2 GuidellinesNET Cust LTU LP1 REG NTU NET Cust LP2ES SES UAS BPV SES UAS BPVProtection Configuration Screen Main Protection Configuration Option Settings Protection Options Settings DescriptionSet Circuit ID Screen Maintenance Hdsl Deployment GuidelinesProduct Specifications Total Access 3000 LTU SpecificationsWarranty and Customer Service L1-5, Issue Prerequisite Procedures Install the LTUs Into Total AccessIntroduction Materials RequiredInstall the DUAL-SLOT Standalone Housing Install the NTUReset ALL Equipment to Operating Condition Disabling Protection SwitchingDisabling Protection Switching Adjust Wiring at Dual Remote HousingL1-5, Issue Unpack and Inspect the the Total Access DS3 MUX Modules Install the DS3 MUX ModulesTable B-1. Faceplate LED Indicators Provision the DS3 MUXInstall the LTU Provision the LTUInstall the NTU into the Dual-Slot Remote Housing 61182007L1-5A L1-5, Issue L1-5, Issue