ADC Network Unit user manual Power and Ground Connections, Installation August 7

Page 14

Chapter 2: Installation

August 7, 2006

Step

Action

6Connect the power supply to the DC IN connector located on the back of the ENIU.

If using AC power, connect power supply to the AC source (110 – 240 VAC, 50 – 60 Hz).

If using DC power, connect power following local practices. (See “Power and Ground Connections” on page 2-2.) See Appendix A: Specifications for fuse size.

7Verify that the STATUS LED is lit.

20384-A1

Figure 2-1. Inserting ENIU into Mounting Bracket

POWER AND GROUND CONNECTIONS

Power and ground connections are located on the back of the ENIU.

DANGER

WARNING

To avoid the possibility of severe and potentially fatal electric shock, use extreme care when working with the power terminations at the back of the ENIU.

Before making any connections to a ENIU, verify that the power is off (unplugged or fuse removed at the fuse and alarm panel).

Ground Connection

To assure proper operation, the ground stud located on the back of the ENIU (see Figure 2-2 on page 2-3) should be connected to a good earth ground. There must be no switching or disconnecting devices in the grounding circuit conductor between the ENIU and the point of connection to the grounding electrode conductor.

This procedure establishes a connection between the ENIU and a ground connection. A frame ground termination (#8 screw) is provided on the back of the ENIU for a frame ground connection. This connection must be made in accordance with all local and national electrical codes. The ENIU should be connected directly to a grounding electrode conductor or to a bonding jumper from a grounded electric box.

2-2

AIWN-UM-7001-01

Image 14
Contents Ethernet Network Interface Unit Eniu Revision History Table of Contents Table of Contents August 7 AIWN-UM-7001-01 List of Figures List of Figures August 7 AIWN-UM-7001-01 List of Tables AIWN-UM-7001-01 ViiList of Tables August 7 Viii AIWN-UM-7001-01 Organization About this ManualIntroduction Intended AudienceReader Alert Meaning Inspecting Your ShipmentAbout This Manual August 7 Overview Product DescriptionOverview August 7 Eniu LED Indicators and ControlsFront Panel Surface Mount Installation InstallationDesktop Installation Ground Connection Power and Ground ConnectionsInstallation August 7 Eniu Rear View with RJ-45 Connector Power Connection Four-Pin Power Plug Wiring DiagramEniu Front View with RJ-45 Connector RJ-45 Ethernet Cables CablingFunction 100 Mbps Ethernet RJ-45 Connector Pin #BaseT Ethernet RJ-45 Connector Pin # Optical CablesEIA-232 Communication Port Defaults DB-9 Communications CableCLI Command Prompts Effective privilege COMMAND-LINE Interface CLICommand Prompt Security Commands OverviewCommands List Initial SET-UPSET Networksubscriber Interface Speed 101001000 Autoforce ConfigurationGET Configuration SET Keep Alive Onoff GET Configuration GET Loopback StatusSET Error Forwarding ON/OFF SET Loopback OnoffSET Echo Onoff OAM ConfigurationSET OAM Configuration Clear System NameSET Discovery Mode Onoff SET Exfo OAM ConfigurationSET OAM Mode Activepassiveoff SET Swap Address Mode OnoffConfigure Alarm Thresholds Purpose August 7 Provisioning User and Privilege SettingsPerformance and Alarms GET UsersGET Optical Thresholds GET TemperatureGET Network Optical Power GET Subscriber Optical Power Clear Performance StatusGET Inventory ResetExit SET LED TestProvisioning August 7 AIWN-UM-7001-01 Specifications Appendix a Specifications August 7 AIWN-UM-7001-01 Product Support Appendix B Product Support August 7 AIWN-UM-7001-01 Glossary AIWN-UM-7001-01 GL-1Glossary August 7 GL-2 AIWN-UM-7001-01 Certification and Warranty World Headquarters For Technical Assistance