Roland TU-60, TU-70, TU-500 Installation and Assembly, Frame and Control Box Installation, Front

Page 8

3. Installation and Assembly

Installation of the control box is a task which must be carried out by two or more persons.

Injury may result if attempted by one person without assistance.

To secure the part in place, use the bolt included with the unit.

A loose bolt or use of other than the specified bolt may result in the falling of the part, leading to injury.

NOTICE

Never install this unit in any of the following situations, as it could result in damage:

Do not install the unit on an unstable surface.

Places with excessive electrical noise.

Places with excessive humidity or dust.

The unit and AC adapter become hot during use. Avoid installation in an are a with poor heat-radiating characteristics (poor ventilation).

Avoid subjecting the unit to severe vibration or shocks.

Places exposed to strong illumination or direct sunlight.

Do not strike the mirror. Doing so may damage the mirror, resulting in incorrect operation.

Be sure to connect the sensor cable securely so that it does not come loose or cause a poor connection during use. Failure to connect securely may cause faulty operation or breakdown.

Be sure to switch off the power to the TU before connecting the sensor cable.

Before affixing the cable retainer, make sure the surface where the retainer is to be attached is clean and free of dust or grime.

Frame and Control Box Installation

Front

Required tool

Large

Frame

Cap screw (large)

Control box

*Move the media flange that is at the rear side of the FJ to the position where it doesn't avoid frame and controller box to be fixed.

When installing on the CJ, carry out the installation with the arm on the back of the machine detached.

6

Image 8
Contents Automatic media take-up unit EC Electromagnetic Compatibility Directive 89/336/EEC Table of Contents EnglishAbout the Symbols To Ensure Safe UseAbout and Notices Do not disassemble, repair, or modifyHands or hair may become caught Model name About the Labels Affixed to the UnitRating label System Configuration Confirmation of Included ItemsFront Installation and AssemblyFrame and Control Box Installation Top View Rail Slider InstallationInstalling the Sensor and the Small Retainer Installing the Mirror Power Cord Connection and Large Retainer InstallationArm Installation Front RearAdjusting the Sensors Position Operation PanelOperating Conditions for the TU For Both the CJ and the FJFor the CJ Only For the FJ OnlySide view of flange Loading MaterialMounting the Flange and Paper Tube Loading Rolled Material CorrectIncorrect Correct IncorrectPrinted surface is moved to the inner side and taken up Securing the Material in PlacePrinted surface is moved to the outer side and taken up Starting Operation Maintenance Removing MaterialWhat to Do If CJ doesnt runFJ doesnt run TU doesnt take up materialSpecifications TU-60 TU-70 TU-400 TU-500Memo R8-990901