Pelco Dx8000 manual C1606M 6/04

Page 38

f.Wait while the DX8000 prepares the newly installed drive for video storage. You will see the following progress bar while the formatting is underway.

Figure 34. PDB Database Creation Progress Bar

4.After the storage allocation procedure is complete, the DX8000 will reboot automatically and the unit will be ready to resume service.

36

C1606M (6/04)

Image 38
Contents DX8000 Page Tools Needed Parts ListIntroduction Removing Power Cord from Wall Getting ReadyRemoving Power Cord from Unit ESD Protection Prepare Unit for Drive Installation Open the Unit ChassisRemoving Chassis Cover Component Layout DX8000 InteriorMove the Front Cross-Brace Removing Front Cross-BracePlacing Front Cross-Brace Across Rear of Unit Disconnect the Data and Power Cables Removing the IDE Data CableRemoving Hard Drive Power Connection Remove the Drive Mount Basket Removing Hard Drive BasketReplace the Primary Hard Disk Remove the Original DriveMount the NEW Drive Inserting the New Drive into the BasketReplacing Drive Basket SET the Master / Slave Jumper Setting Drive Jumper Reconnect the Data and Power Cables Installing CD-RW and Hard Drive Data Cable Installing Power Connector Reassemble the Unit Replacing Front Cross-BraceReplacing Chassis Cover Restarting Unit Install Software on the New Drive Configure System to Boot from CD/DVDAwardBIOS Setup Utility Main Advanced Power C1606M 6/04 Install Software DX8000 Recovery dialog box appearsC1606M 6/04 C1606M 6/04 AwardBIOS Setup Utility Item Specific Help IDE Hard Drive Initialize the New Drive Opening List of DrivesSelecting Allocation Option Formatting Dialog Box C1606M 6/04 Product Warranty and Return Information ISO9001
Related manuals
Manual 32 pages 20.54 Kb Manual 36 pages 35.01 Kb Manual 10 pages 26.21 Kb Manual 1 pages 21.57 Kb