IBM 3531 Preparing the expansion unit, Removing CRUs, Statement, Use safe practices when lifting

Page 17

You will need a flat-blade screwdriver and a Phillips-head screwdriver to install your expansion unit. Each type of enclosure comes with general installation instructions for installing optional devices.

Before you begin, review the following assumptions:

If you are installing the expansion unit in a rack, you have already installed the other components in the rack and moved the rack to its permanent operating location.

You have already installed and configured the host controllers and appropriate host adapters.

There are 68-pin VHDCI SCSI cables attached to the host controllers, ready for final connection to the expansion unit.

The installation site meets all area, environmental, power, and site requirements for the expansion unit. Refer to the expansion unit requirements listed under “Operating specifications” on page 5.

Preparing the expansion unit

This section explains how to remove the CRUs and set the interface options to prepare the expansion unit for installation.

Removing CRUs

It is easier to lift the expansion unit and install it in a rack or tower enclosure if you remove all CRUs (disk drives, power supplies, and ESMs) first. A fully loaded expansion unit with 14 disk drives and two power supplies with built-in fans installed weighs 36.1 kg (79.5 lb). The standard unit with two power supplies weighs 22.5 kg (49.5 lb). If you remove all the CRUs, you can reduce the overall weight.

Attention: If you have data stored on the drives, label the drives before you remove them. Then, when you replace the drives, install each one in the same drive bay from which you removed it.

See “Locations” on page 8 for information on removing the CRUs.

Statement 4

≥18 kg (37 lbs)

≥32 kg (70.5 lbs)

≥55 kg (121.2 lbs)

CAUTION:

Use safe practices when lifting.

Netfinity EXP300 Type 3531 9

Image 17
Contents Ff X pypi Page Ff X pypi Page About this manual Important safety informationOnline support Contents Page Netfinity EXP300 Type FeaturesDisk drive storage Clustering supportGeneral Turning on the expansion unit Diagnostics and Test InformationProblem Reference Turning off the expansion unit Turning on the expansion unit after an emergency Operating specificationsTurning off the expansion unit in an emergency System-management software support Symptom-to-FRU index Locations Getting started Preparing the expansion unit Use safe practices when liftingRemoving CRUs StatementExternal option switches Setting the interface options and ID settingsInternal option switches Option switch 1 Power-control switchUnit ID dial switch Hot-swap drive bays Netfinity EXP300 baysBridge card bay Important information for IBM ServeRAIDSwitch card bay ESM and power supply baysHot-swap power supply/fan bays Hot-swap ESM baysPower-on LED green Front controls, indicators, and devicesPower-supply controls, indicators, connectors Rear controls, indicators, and connectorsESM board user controls Working with hot-swap drives Hard disk drives Installing hot-swap drivesLED State Description ServeRAID information Replacing hot-swap drives Removing a hot-swap power supply/fan unit Working with hot-swap powerReplacing a bridge card Installing a hot-swap power supply / fan unitWorking with cards and boards Installing a bridge card Replacing the switch cardRemoving the switch card Removing a bridge cardReplacing an ESM board Conversion of EXP300 to a tower or from a tower Installing the EXP300 in a rack Netfinity EXP300 Type 3531 IBM Netfinity EXP300 Type 3531 Hardware Maintenance Manual Installing the EXP300 in a Tower Statement Installing identification labels Serial number label Scsi ID label Expansion unit ID label Installing the EXP300 in a NetBAY enclosure FrontRear Completing the installation Cabling the expansion unit Index System Netfinity EXP300 Type FRU No Parts Listing SystemOptions Power Cords IBM Netfinity EXP300 Type 3531 Hardware Maintenance Manual General safety Safety informationElectrical safety Safety inspection guide Handling electrostatic discharge-sensitive devices Grounding requirements Safety notices multi-lingual translationsDo not Statement ≥18 kg 37 lbs ≥32 kg 70.5 lbs ≥55 kg 121.2 lbs IBM Netfinity EXP300 Type 3531 Hardware Maintenance Manual Perigo ImportanteCuidado Para Conectar Para DesconectarAo levantar a máquina, faça-o com segurança Instrução IBM Netfinity EXP300 Type 3531 Hardware Maintenance Manual Related service information IBM Netfinity EXP300 Type 3531 Hardware Maintenance Manual Related service information IBM Netfinity EXP300 Type 3531 Hardware Maintenance Manual Related service information IBM Netfinity EXP300 Type 3531 Hardware Maintenance Manual Related service information IBM Netfinity EXP300 Type 3531 Hardware Maintenance Manual Related service information Connexion Déconnexion Related service information IBM Netfinity EXP300 Type 3531 Hardware Maintenance Manual Vorsicht WichtigAchtung Kabel anschlieβen Kabel lösenVorsicht Achtung Pericolo Attenzione Per collegare Per scollegarePericolo Attenzione Related service information IBM Netfinity EXP300 Type 3531 Hardware Maintenance Manual Related service information Peligro Apáguelo Para la conexin Para la desconexiínPeligro Precaución Thank you for your response Problem determination tipsSend us your comments Trademarks IBM Page Part Number 06P8514