Statement 4
≥18 kg (37 lbs) | ≥32 kg (70.5 lbs) | ≥55 kg (121.2 lbs) |
CAUTION:
Use safe practices when lifting.
7.Slide the expansion unit into the rack, and insert the M6 screws Þ Ý. Do not overtighten the M6 Þ Ý screws.
8.Tighten the rear screws Þ Ý.
9.Verify that option switches 1 and 2 (inside the switch card) are set to off (see “Setting the interface options and ID settings” on page 10 for more information).
10.Install hard disk drives and power supplies in the EXP300 expansion unit according to “Locations” on page 8; then, return here to complete the installation.
11.Continue with “Completing the installation” on page 35.
Installing the EXP300 in a Tower
The IBM® Netfinity® EXP300
Before installing the expansion unit you must: