Theta Digital LC3015-2 manual Other Requirements

Page 15

Other Requirements

Air supply

ITEM

 

Pressure/Volume

ISO8573.1 standard

 

 

 

 

Machine

 

80 psi at 9 ft3/min 4

Class 3-4-3

As cutting gas

 

140 psi at 35 ft3/min 5

Class 3-4-3

Dust collector - Torit DFT3-18

 

9 scfm at 90-100 psi

Class 4-5-5

 

 

 

 

Dust collector - Farr GS-12

 

12 scfm at 90 psi

 

 

 

 

 

Laser Oscillator Gas

 

see laser pre-mix gas specification (p. 9 )

n/a

 

 

 

 

Assist gases

 

see assist gas recommendations (p. 10 )

n/a

 

 

 

 

Coolant

 

 

Chiller coolant includes the following:

 

 

 

Distilled water

(Koolant Kooler: 75 gallons, CKD: 100 gallons, Orion: 50 gallons)

 

 

Additive (provided with machine) 6

1 gallon provided (mix 1:100 additive:water)

Connections

Hoses to connect air supplies to machine and dust collector

Laser pre-mixed gas (see page 9)

Assist gas (oxygen minimum) (see page 10)

42 micron maximum particulate size

5Pressure and flow based on process requirements (material type and thickness) - contact Amada to discuss.

6ISOGUARD Corrosion inhibitor, part# 71679859. Additional quantities available from AESI, at (714) 670-2111

LC3015 Theta User Installation Guide - October, 2003

7

Image 15
Contents Theta LC30152 Document title Applies toRevision history Contents Dust Collectors Table of Figures Electrical connect 230 VAC Pre-Installation Checklist Placement of the Machine and ComponentsItems to be Obtained Preparation Electrical RequirementsDescription of the Major Components Major Components Size and Weight of Major Components Feature Specification Basic SpecificationsLaser and Production Cutting Specifications Supply Requirements Other Requirements Connections Air specifications ISO 8573.1 standardBOC Gases Laser Pre-mix GasMoisture Laser Pre-mix Gas SpecificationGas Pre-mix ratios PurityAssist Gas Recommendations Oxygen PurityGas Assignment Inlet Port Machine from shuttle end Machine Dimensions LC3015 Theta Front ViewMachine from operator side Machine Dimensions LC3015 Theta Side ViewMachine from top Machine Dimensions LC3015 Theta Plan ViewPlanning The Location of the Machine Chiller Orion Chiller Chiller DimensionsTorit DFT3-18 Dust CollectorsTorit DFT3-18, side view Farr GS-12 Machine Foundations Foundation plan and side views Machine Foundations Cross SectionFoundation right end view Foundation End ViewBolt Detail Lifting Installing The Air Supply Installing The Electrical Power Supply Laser and CNC groundingGrounding resistance Electrical connect 460 VAC Electrical connect 230 VAC LC3015 Theta User Installation Guide October CNC power connect, Figure Power cable Breaker Protective Coatings Company/group Purpose Phone Revision historyContact Information Version Details