Theta Digital LC3015-2 manual Major Components

Page 10

Major Components

Machine

Dust Collector

Gas connection kit

Accessory crate

 

HOT AIR

 

DISCHARGE

AIR

AIR

SUCTION

SUCTION

78.1" (for 4 KW system)

 

71.9” (for 2 KW system)

 

 

Chiller

2

LC3015 Theta User Installation Guide - October, 2003

Image 10
Contents Theta LC30152 Applies to Document titleRevision history Contents Dust Collectors Table of Figures Electrical connect 230 VAC Placement of the Machine and Components Pre-Installation ChecklistItems to be Obtained Electrical Requirements PreparationDescription of the Major Components Major Components Size and Weight of Major Components Basic Specifications Feature SpecificationLaser and Production Cutting Specifications Supply Requirements Other Requirements Air specifications ISO 8573.1 standard ConnectionsLaser Pre-mix Gas BOC GasesPurity Laser Pre-mix Gas SpecificationGas Pre-mix ratios MoistureOxygen Purity Assist Gas RecommendationsGas Assignment Inlet Port Machine Dimensions LC3015 Theta Front View Machine from shuttle endMachine Dimensions LC3015 Theta Side View Machine from operator sideMachine Dimensions LC3015 Theta Plan View Machine from topPlanning The Location of the Machine Chiller Chiller Dimensions Orion ChillerDust Collectors Torit DFT3-18Torit DFT3-18, side view Farr GS-12 Machine Foundations Machine Foundations Cross Section Foundation plan and side viewsFoundation End View Foundation right end viewBolt Detail Lifting Installing The Air Supply Laser and CNC grounding Installing The Electrical Power SupplyGrounding resistance Electrical connect 460 VAC Electrical connect 230 VAC LC3015 Theta User Installation Guide October CNC power connect, Figure Power cable Breaker Protective Coatings Version Details Revision historyContact Information Company/group Purpose Phone