Theta Digital LC3015-2 manual Laser Pre-mix Gas, BOC Gases

Page 17

Laser Pre-mix Gas

Laser gas quality is critical to the performance and reliability of the laser. Based on our experi- ence, we recommend BOC’s LASERSHIELD F or AGA’s LaserMix 21.

Call either of these national 800 numbers to locate the supplier closest to you.

AGA Gas Inc.

1-800-837-7226

BOC GASES

1-800-742-4726HTTP://www.boc.com

A two stage regulator and twenty-five feet of hose with 3/8" fittings is provided to connect the gas bottle to the laser. If the installation requires a longer length, use Teflon/polyethylene hose only.

IMPORTANT - The installation of your machine can not be completed without the correct laser gas. Be sure to obtain at least two bottles prior to scheduling installation. The typical gas bot- tle will hold 220 ft3 of usable gas. For the 2000W laser, a single bottle of gas should last one to two months on a single shift basis. However, during installation, more gas is used than in normal operation.

LC3015 Theta User Installation Guide - October, 2003

9

Image 17
Contents Theta LC30152 Revision history Document titleApplies to Contents Dust Collectors Table of Figures Electrical connect 230 VAC Items to be Obtained Pre-Installation ChecklistPlacement of the Machine and Components Preparation Electrical RequirementsDescription of the Major Components Major Components Size and Weight of Major Components Feature Specification Basic SpecificationsLaser and Production Cutting Specifications Supply Requirements Other Requirements Connections Air specifications ISO 8573.1 standardBOC Gases Laser Pre-mix GasGas Pre-mix ratios Laser Pre-mix Gas SpecificationPurity MoistureGas Assignment Inlet Port Assist Gas RecommendationsOxygen Purity Machine from shuttle end Machine Dimensions LC3015 Theta Front ViewMachine from operator side Machine Dimensions LC3015 Theta Side ViewMachine from top Machine Dimensions LC3015 Theta Plan ViewPlanning The Location of the Machine Chiller Orion Chiller Chiller DimensionsTorit DFT3-18 Dust CollectorsTorit DFT3-18, side view Farr GS-12 Machine Foundations Foundation plan and side views Machine Foundations Cross SectionFoundation right end view Foundation End ViewBolt Detail Lifting Installing The Air Supply Grounding resistance Installing The Electrical Power SupplyLaser and CNC grounding Electrical connect 460 VAC Electrical connect 230 VAC LC3015 Theta User Installation Guide October CNC power connect, Figure Power cable Breaker Protective Coatings Contact Information Revision historyVersion Details Company/group Purpose Phone