Theta Digital LC3015-2 manual Pre-Installation Checklist, Items to be Obtained

Page 7

LC3015 Theta Pre-Install Check List

(checklist page i)

Pre-Installation Checklist

This form must be completed, signed, and faxed back to Amada’s service department. This is required before installation of your Amada laser can begin.

Each of the following items must be completed prior to scheduling a service engineer for installation. Please contact the Laser Service Department if you have any questions in completing these steps.

East Coast office: Covington, GA

1-800-345-2374 Voice

1-770-787-0934 Fax

West Coast office: La Mirada, CA

1-800-334-2374 Voice

1-714-690-3248 Fax

 

 

 

￿Uncrate the machine.

￿Before placing the machine on the foundation, put all the jack bolts in place in the machine feet, and screw them down so that about 1” of the bolts extend below the bottom of the feet.

￿Do not install the anchor bolts (required) until after A.E.S.I. completes the initial installation.

It is the purchaser’s responsibility to install necessary safety devices.

Items to be Obtained:

￿Distilled Water (Koolant Kooler: 75 gallons, CKD: 100 gallons, Orion: 50 gallons)

￿Laser gas mix: two bottles. See page 9 for details.

￿Assist gas: Oxygen, Nitrogen. See page 10 for details.

Placement of the Machine and Components:

￿Plan the location of the machine, gas bottles, chiller, dust collector and any other accessory equip- ment. Take into account all the maintenance areas indicated on the floor plan.

￿Prepare the machine foundation as required.

￿The floor must be cleared of obstructions, clean and free of debris

￿Each system component has been placed according to the Pre-install Guide

￿Laser Gas bottle placed and secured from falling (25’ of gas hose is supplied)

￿Assist gases placed (50’ of gas hose is supplied for nitrogen and oxygen) (see page 10)

i

Image 7
Contents Theta LC30152 Applies to Document titleRevision history Contents Dust Collectors Table of Figures Electrical connect 230 VAC Placement of the Machine and Components Pre-Installation ChecklistItems to be Obtained Preparation Electrical RequirementsDescription of the Major Components Major Components Size and Weight of Major Components Feature Specification Basic SpecificationsLaser and Production Cutting Specifications Supply Requirements Other Requirements Connections Air specifications ISO 8573.1 standardBOC Gases Laser Pre-mix GasMoisture Laser Pre-mix Gas SpecificationGas Pre-mix ratios PurityOxygen Purity Assist Gas RecommendationsGas Assignment Inlet Port Machine from shuttle end Machine Dimensions LC3015 Theta Front ViewMachine from operator side Machine Dimensions LC3015 Theta Side ViewMachine from top Machine Dimensions LC3015 Theta Plan ViewPlanning The Location of the Machine Chiller Orion Chiller Chiller DimensionsTorit DFT3-18 Dust CollectorsTorit DFT3-18, side view Farr GS-12 Machine Foundations Foundation plan and side views Machine Foundations Cross SectionFoundation right end view Foundation End ViewBolt Detail Lifting Installing The Air Supply Laser and CNC grounding Installing The Electrical Power SupplyGrounding resistance Electrical connect 460 VAC Electrical connect 230 VAC LC3015 Theta User Installation Guide October CNC power connect, Figure Power cable Breaker Protective Coatings Company/group Purpose Phone Revision historyContact Information Version Details