List of Illustrations |
| |
1 | Package Components | . 8 |
2 | Removing the Bubble | . 9 |
3 | Ceiling/ Wall Installation | 11 |
4 | Concrete Ceiling/ Wall Installation | 11 |
5 | Removing the Surface Mount Ring from the Back Box | 12 |
6 | Ceiling Tile Installation with Adapter Plate | 13 |
7 | Ceiling Tile Installation with Surface Mount Ring | 13 |
8 | 15 | |
9 | 4S Standard Electrical Box Installation | 16 |
10 | 4S Deep Electrical Box Installation | 17 |
11 | Location of Zoom and Focus Locking Screws | 18 |
12 | Adjusting the Focus | 19 |
13 | Adjusting the | 20 |
14 | Threshold Switching Levels | 23 |
15 | Adjusting the | 24 |
16 | Threshold Switching Levels | 26 |
17 | Positioning the Camera | 28 |
18 | Installing the Liner | 29 |
19 | Installing the Bubble | 29 |
20 | Service Connector | 30 |
21 | Attaching the 2.5 mm Monaural Headphone Plug | 31 |
List of Tables |
| |
A | Power Input: Surface, Ceiling/ Wall Installation | 11 |
B | Power Input: | 15 |
C | Power Input: | 15 |
D | Power Input: Surface, 4S Standard Electrical Box Installation | 16 |
E | Power Input: | 17 |
F | DN/CH/C Series Approximate Switching Thresholds | 24 |
G | DW/CW Series Approximate Switching Thresholds | 27 |
4 |