Figure 3-1 Film pack simulator and power suplly
C. TEST EQUIPMENT OPERATION
Checkout the
1.Power supply and pack simulator (Figure 3-1)
In use the system subsitutes for the film pack, giving a steady, reliable source of power.
a.Plug the pack simulator into the power supply being careful to observe polarity (ground is negative).
b.Set the power supply switch to VOLTS and turn the supply ON.
c.Adjust the output to the desired volatge (5.8v normal).
NOTE : Except on