Contents
| Installing the Switch Module in the Blade Enclosure | 6 | |||||
| Switch Module IP Addresses | 8 |
|
|
| ||
| Using the Onboard Administrator to Assign an IP Address to the Switch Module and Running Express | ||||||
| Setup 9 |
|
|
|
|
|
|
| Using Express Setup | 11 |
|
|
|
| |
| Setting the Installed Switch Module As the Stack Master 12 | ||||||
| Refreshing the PC IP Address | 13 |
|
|
| ||
| Planning and Creating a Switch Stack | 13 |
|
| |||
| Stack Cabling Configurations | 14 |
|
|
| ||
| Connecting to the StackWise Plus Ports | 16 |
| ||||
| Installing Devices in the | 17 | |||||
| Installing X2 Transceiver Modules and Cisco Converter Modules 18 | ||||||
| Installing SFP Modules 20 |
|
|
|
| ||
| Connecting to the 10/100/1000 Ports | 22 |
|
| |||
| Planning 10/100/1000 Ethernet Port Connections | 23 | |||||
| Where to Go Next | 24 |
|
|
|
|
|
| Troubleshooting 1 |
|
|
|
|
|
|
C H A P T E R 3 |
|
|
|
|
|
| |
| Diagnosing Problems | 1 |
|
|
|
|
|
| Verify the Switch Module POST Results | 1 |
| ||||
| Look at the Switch Module LEDs | 2 |
|
| |||
| Confirm the Switch Module Connections | 2 |
| ||||
| Verify the Switch Module Performance | 4 |
| ||||
| Clearing the Switch Module IP Address and Configuration 5 | ||||||
| Replacing a Failed Stack Member | 5 |
|
|
| ||
| Locating the Switch Module Serial Number | 6 |
| ||||
| Technical Specifications |
|
|
|
|
| |
A P P E N D I X A | 1 |
|
|
|
| ||
| Connector and Cable Specifications |
|
|
|
| ||
A P P E N D I X B |
| 1 |
|
| |||
| Connector Specifications | 1 |
|
|
|
| |
| 10/100/1000 Ports | 1 |
|
|
|
| |
| 3 |
| |||||
| Cisco TwinGig Converter Module Ports | 3 |
| ||||
| Console Port 4 |
|
|
|
|
|
|
Cisco Catalyst Blade Switch 3120 for HP Hardware Installation Guide
4 |
| |
|