Installation
3.6 Insertion-Type Mounting
The cell can be inserted into a 1” N.P.T. threaded opening, but it is imperative that the tank or chamber be full under all process conditions. Make certain the liquid head is above the cell location. A vertical insertion (from above) or a horizontal insertion can be used. To install, simply tighten the cell into a 1” N.P.T. threaded opening (using a Teflon thread compound such as Teflon tape) so that the entire electrode is immersed in the measured solution. Allow at least
11/2" | 1 1/2" | FlowOut |
|
3/4"NPT |
| ||
(38mm) | FlowChamber | ||
Octagon | (38mm) | 11/2" | |
|
|
| |
|
| (38mm) |
|
11/2" |
| Octagon | 3/4"NPT |
|
| ||
(38mm) | CELL |
|
|
|
| IN | |
|
| 83/4" |
|
|
| (222mm) |
|
131/4"
(337mm)
1"Fitting Allow73/4"(197mm) for removal o f cell
FlowIn
Notes
1.Mount cell and flow chamber horizontally as shown above with flow exit “up to eliminate possible air gap around cell body.
2.If cell and flow chamber must be mounted vertically, attach a short length of tubing to flow exit as shown below and form a trap to ensure filing of flow chamber, especially at low flow.
CELL
2"min. (51mm)
IN
Figure 3-2 Dimension Drawing for 276127 Flow Housing
12/07 | 4905 Series Conductivity Cells – Installation and Maintenance | 7 |