Installation
3.Using a strap wrench on the mounting nipple, tighten the assembly an additional
4.Close the ball valve; handle perpendicular to valve.
A purge port is provided on the removal device housing. Water or some other fluid source can be piped to this port for the purpose of cleaning out the valve assembly from accumulated debris. For most conductivity applications, the process stream will not have high particle content and the purge port is not used.
If purging is required remove plug and install a purge line to the ¼” NPT opening. Note that the purge fluid temperature and pressure must not exceed the 4909 Assembly temperature and pressure specifications as shown in Fig.
Another use for the purge port can be realized if a pressure gage is installed in the ¼” NPT opening. It will serve as a local indication of process pressure to confirm that the pressure is below 50 psig during insertion or removal of the cell.
Make sure the bushing and washer are in place on the support tube, then feed the cable of the 4908 Conductivity Cell through the support tube and turn the tube hand tight onto the conductivity cell. Using a strap wrench, tighten the 4908 Cell an additional
Tighten the cable grip to provide strain relief from the cell cable.
If X1 is selected in Table IV of the Model Selection Guide, then the 4908 Conductivity Cell has been pre- mounted by Honeywell onto the support tube. Also cable wiring to the universal head terminal board has been completed. The valve assembly can then be mounted to the process by following steps under “Mounting into the Process” mentioned earlier.
3.4Insertion
1.Make sure the bushing and washer (Fig.
2.Obtain the cell and support tube assembly prepared earlier. Separate the compression handle from the support grip by turning the support grip counterclockwise approximately two turns. Slide the compression handle along the support tube until the bushing and washer are sandwiched between the handle and 4908 Cell Adapter.
3.Slide the cell and tube assembly into the removal device housing and tighten the compression handle clockwise until drag is felt on the tube. This can be determined by rotating the tube by hand.
4.REDUCE PROCESS PRESSURE TO 50 PSIG OR LESS. Open the ball valve; handle parallel to valve.
5.Push the cell and support tube assembly all the way in using the support grip.
6.Tighten the support grip by turning clockwise two turns.
ATTENTION
This step is important to prevent
7.Return the process to normal operating pressure.
8.Further tighten the compression handle if leakage occurs from the bushing seal area.
7/99 | 4909 CPVC Conductivity Cell Insertion/Removal Assembly– Operations Manual | 13 |