Honeywell 4909 CPVC manual Red

Page 28

4909 CPVC Conductivity Cell Insertion/Removal Assembly Operations Manual

Four Point Terminal Plate

 

with #6-32 Screw Terminals

Five Point Terminal Board.

 

Each Terminal Will Accept

 

#16 Gage Max. Wire

 

 

 

 

 

1000 ft. max.

 

Temp.

RED

B

 

 

Note 3

 

 

 

A

D

B

 

Comp.

 

 

 

 

 

D

Coax Cable Shield

 

 

 

 

 

 

GREEN

D

B

C

 

 

A

 

 

 

C

 

 

 

Cell

WHITE

 

 

C

 

BLACK

 

 

 

 

 

 

A

 

 

Note 2

W K SH G R

 

Internal Cell Assembly

 

 

 

 

 

 

 

 

Configuration

 

View of Junction Box Head

 

 

 

 

 

with Cap Removed

 

Note 1

Cell Assembly Connections

I

4905 -

4973 I

4974 -

4908 I

4909 -

II

III

 

 

IV

V

 

VI

Conductivity/Resistivity

 

 

 

 

Analyzer

GND

-

 

333

-

 

X1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

II

III

 

 

IV

V

 

 

 

 

 

Analyzer Input Connections

 

 

 

 

 

 

 

 

 

 

333

- X1

-

 

 

 

 

 

VI VII

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

II

III

 

IV

V

 

 

 

 

-

 

333

-

 

X1

 

 

 

 

 

 

 

 

 

NOTES:

1.For pure water samples in non-conductive (plastic, glass, etc.) piping, ground the black cell electrode lead near the cell. Alternatively, connect to the 7082 ground screw as shown dotted. Do not ground 10, 25, or 50 constant cells.

2.7082-16, 17, 18, 19 (only)

Use 22 gage minimum coaxial cable type RG59/U connecting shield to terminal "SH" only.

3.7082-16, 17, 18, 19

For cable runs of up to 500 ft., use: 18 gage minimum, three conductor cable.

For cbale runs of 500 - 1000 ft., use: 16 gage minimum, three conductor cable.

7082-13, 14, 15 [coax and shield (SH) not used]

For cable runs of up to 500 ft., use: 18 gage minimum, four conductor cable.

For cable runs of 500 - 1000 ft., use: 16 gage minimum, four conductor cable.

4.Cell to analyzer cables are considered low level. Run seperate from high level wiring.

a/n 23345

Figure 5-1 Installation Diagram-Cat. 4909 Cells with Junction Box Head

Connected to 7082 Conductivity/Resistivity Analyzer

20

4909 CPVC Conductivity Cell Insertion/Removal Assembly– Operations Manual

7/99

Image 28
Contents 70-82-25-19 Rev 7/99 Copyright, Notices, and Trademarks Revision 1- 7/99Abstract Revision NotesReferences ContactsOrganization Telephone Address Honeywell TAC Voice Contents Platinization and Platinum Black Figures Page Overview Introduction4908 Conductivity Cell Temperature/Pressure* Range 31074357 Removal DeviceValve NPT Plug Conductivity Cell Conductivity Cell Adapter Set Screw #6-32 Binding Head Page Specifications and Model Selection Guide SpecificationsIntegral Automatic Temperature Compensation LeadwireWeight Model Selection GuideSelection Table VII Options Installation RequirementsLocation and Position ConsiderationsInitial Prep Prepare AssemblyMounting into the Process Insertion Removal Electrical ConnectionsRED White Green To Clean The Cell Maintenance and Replacement Parts Replacing Removal Device Parts Replacement Parts Replacement PartsVoltage and Time Limits for Platinizing Cells Platinization and Platinum Black RED Green Direct Cell to Analyzer Installation #2 TempNote 5 Compensator Page Page Industrial Automation and Control