Honeywell 4909 CPVC manual Contents

Page 5

 

Contents

 

1.

INTRODUCTION

1

1.1

Overview

1

1.2

4908 Conductivity Cell

1

1.3

31074357 Removal Device

2

2.

SPECIFICATIONS AND MODEL SELECTION GUIDE

7

2.1

Specifications

7

 

Cell Constants

7

 

Electrode Material

7

 

Wetted Parts

7

 

Pressure and Temperature (See Fig. 1-1)

7

 

Maximum Pressure

7

 

Mounting

7

 

Purge Port

7

 

Insertion Depth

7

 

Electrical Connections

7

 

Integral Automatic Temperature Compensation

8

 

Leadwire

8

 

Weight

8

2.2

Model Selection Guide

8

 

...........................................................................................................................................................

8

3.

INSTALLATION

11

3.1

Requirements

11

3.2

Location and Position

11

 

Considerations

11

3.3

Prepare Assembly

12

 

Initial Prep

12

 

Mounting into the Process

12

3.4

Insertion

13

3.5

Removal

14

3.6

Electrical Connections

14

7/99

4909 CPVC Conductivity Cell Insertion/Removal Assembly– Operations Manual

v

Image 5
Contents 70-82-25-19 Rev 7/99 Revision 1- 7/99 Copyright, Notices, and TrademarksRevision Notes AbstractReferences ContactsOrganization Telephone Address Honeywell TAC Voice Contents Platinization and Platinum Black Figures Page 4908 Conductivity Cell IntroductionOverview 31074357 Removal Device Temperature/Pressure* RangeValve NPT Plug Conductivity Cell Conductivity Cell Adapter Set Screw #6-32 Binding Head Page Specifications Specifications and Model Selection GuideLeadwire Integral Automatic Temperature CompensationWeight Model Selection GuideSelection Table VII Options Requirements InstallationLocation and Position ConsiderationsMounting into the Process Prepare AssemblyInitial Prep Insertion Electrical Connections RemovalRED White Green Replacing Removal Device Parts Maintenance and Replacement PartsTo Clean The Cell Voltage and Time Limits for Platinizing Cells Replacement PartsReplacement Parts Platinization and Platinum Black RED Green Direct Cell to Analyzer Installation #2 TempNote 5 Compensator Page Page Industrial Automation and Control