Honeywell 4909 CPVC manual Direct Cell to Analyzer Installation

Page 30

4909 CPVC Conductivity Cell Insertion/Removal Assembly Operations Manual

 

 

Temp.

 

 

 

 

 

 

RED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Comp.

 

 

 

GREEN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cell

 

 

 

 

 

 

WHITE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BLACK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cell Assembly Connections

 

 

 

 

 

I

II

III

 

IV

V VI

4905

-

-

333

 

- X1

 

 

 

 

4973

I

II

III

 

 

IV

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4974

-

333 - X1

-

 

 

 

 

 

 

 

20 ft. max.

Red

Green

Black

White

Cell cable is approx. .250" (6.4mm) O.D. max. with 4 conductors of #18 AWG wire, 7 or 20 foot length.

Direct Cell to Analyzer Installation

Five Point Terminal Board.

Each Terminal Will Accept

#16 Gage Max. Wire

W K SH G R

 

Note 1

 

Conductivity / Resistivity Analyzer

GND

Analyzer Input Connections

 

4908

 

I

II

III

IV

V

4909

-

 

-

 

333 -

X1

 

 

 

 

 

 

 

 

 

Cell Assembly Connections

 

 

I

II

III

 

IV

V

4905

-

-

333

-

X1

 

4973

I

II

III

 

IV

V

 

 

 

 

 

 

4974

-

333

- X1

-

 

 

4908

I

II

III

 

IV

V

-

-

333

-

X1

 

4909

 

 

 

 

 

 

 

VI

VII

 

 

20 ft. max.

1000 ft. max.

 

 

Note 3

 

Red

R

 

Green

G

 

 

 

Black

K

 

W

 

White

 

 

 

Junction Box

Note 2

 

 

VI

 

 

 

Cell to Analyzer Through Junction Box

VI

VII

 

Coax Cable Shield

 

 

Conductivity/Resistivity

 

Analyzer

W K SH G R

Analyzer Input

 

Connections

Note 1

 

 

GND

NOTES:

1.For pure water samples in non-conductive (plastic, glass, etc.) piping, ground the black cell electrode lead near the cell. Alternatively, connect to the 7082 ground screw as shown dotted. Do not ground 10, 25, or 50 constant cells.

2.7082-16, 17, 18, 19 (only)

Use 22 gage minimum coaxial cable type RG59/U connecting shield to terminal "SH" only.

3.7082-16, 17, 18, 19

For cable runs of up to 500 ft., use: 18 gage minimum, three conductor cable.

For cbale runs of 500 - 1000 ft., use: 16 gage minimum, three conductor cable.

7082-13, 14, 15 [coax and shield (SH) not used]

For cable runs of up to 500 ft., use: 18 gage minimum, four conductor cable.

For cable runs of 500 - 1000 ft., use: 16 gage minimum, four conductor cable.

4.Cell to analyzer cables are considered low level. Run seperate from high level wiring.

a/n 23346

Figure 5-3 Installation Diagram-Cat. 4909 Cells with 7 or 20 Foot Leads

Connected to 7082 Conductivity/Resistivity Analyzer

22

4909 CPVC Conductivity Cell Insertion/Removal Assembly– Operations Manual

7/99

Image 30
Contents 70-82-25-19 Rev 7/99 Copyright, Notices, and Trademarks Revision 1- 7/99References AbstractRevision Notes ContactsOrganization Telephone Address Honeywell TAC Voice Contents Platinization and Platinum Black Figures Page Introduction Overview4908 Conductivity Cell Temperature/Pressure* Range 31074357 Removal DeviceValve NPT Plug Conductivity Cell Conductivity Cell Adapter Set Screw #6-32 Binding Head Page Specifications and Model Selection Guide SpecificationsWeight Integral Automatic Temperature CompensationLeadwire Model Selection GuideSelection Table VII Options Location and Position InstallationRequirements ConsiderationsPrepare Assembly Initial PrepMounting into the Process Insertion Removal Electrical ConnectionsRED White Green Maintenance and Replacement Parts To Clean The CellReplacing Removal Device Parts Replacement Parts Replacement PartsVoltage and Time Limits for Platinizing Cells Platinization and Platinum Black RED Green Direct Cell to Analyzer Installation #2 TempNote 5 Compensator Page Page Industrial Automation and Control