Honeywell 4909 CPVC manual Abstract, Revision Notes, References, Contacts

Page 3

About This Document

Abstract

The purpose of this document is to support the installation operation and maintenance of the 4909 CPVC Conductivity Cell Removal/Insertion Assembly.

Revision Notes

The following list provides notes concerning all revisions of this document.

Rev. ID

Date

Notes

0

11/96

This revision is the initial release of the Honeywell version of the L&N manual

 

 

p/n 277731 Rev. E1. There were no major changes to the L&N version when

 

 

it was Honeywellized.

1

6/99

Edits were made to standardize terminology and to add the new Model

 

 

Selection Guide.

References

Honeywell Documents

The following list identifies all Honeywell documents that may be sources of reference for the material discussed in this publication.

Document Title

ID #

9782 Series Conductivity/Resistivity Analyzer/Controller Operator’s Manual

70-82-25-74

7079-17 Two-Wire Transmitter for Conductivity/Resistivity Operation and

70-82-25-51

Maintenance Manual

 

Non-Honeywell Documents

The following list identifies select non-Honeywell documents that may be sources of reference for the material discussed in this publication.

Title

Author

Publisher

ID/ISDN #

Contacts

The following list identifies important contacts within Honeywell.

7/99

4909 CPVC Conductivity Cell Insertion/Removal Assembly– Operations Manual

iii

Image 3
Contents 70-82-25-19 Rev 7/99 Revision 1- 7/99 Copyright, Notices, and TrademarksContacts AbstractRevision Notes ReferencesOrganization Telephone Address Honeywell TAC Voice Contents Platinization and Platinum Black Figures Page Introduction Overview4908 Conductivity Cell 31074357 Removal Device Temperature/Pressure* RangeValve NPT Plug Conductivity Cell Conductivity Cell Adapter Set Screw #6-32 Binding Head Page Specifications Specifications and Model Selection GuideModel Selection Guide Integral Automatic Temperature CompensationLeadwire WeightSelection Table VII Options Considerations InstallationRequirements Location and PositionPrepare Assembly Initial PrepMounting into the Process Insertion Electrical Connections RemovalRED White Green Maintenance and Replacement Parts To Clean The CellReplacing Removal Device Parts Replacement Parts Replacement PartsVoltage and Time Limits for Platinizing Cells Platinization and Platinum Black RED Green Direct Cell to Analyzer Installation #2 TempNote 5 Compensator Page Page Industrial Automation and Control