Platinization and Platinum Black

 

 

 

 

 

 

Five Point Terminal Board.

 

 

 

 

 

 

 

 

 

Each Terminal Will Accept

 

 

 

 

 

 

 

 

 

#16 Gage Max. Wire

 

 

 

 

 

 

Four Point Terminal Plate

 

 

 

 

 

 

 

 

with #6-32 Screw Terminals

 

 

SH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1000 ft. max.

 

G

#2 Temp

(Note 5)

 

 

 

 

 

 

 

R

 

 

 

 

 

 

 

Note 3

 

Compensator

 

 

 

 

 

 

 

 

 

 

RED

B

 

 

 

 

D

 

G

#1 Temp

 

 

 

 

 

 

 

 

 

Temp.

 

 

A

 

D

B

 

R

Compensator

Comp.

 

 

 

 

 

 

 

 

 

 

GREEN

D

 

B

 

C

Note 2

 

W

Cell 2 (Note 5)

WHITE

C

 

 

 

 

 

 

K

Electrodes

 

 

 

 

 

 

W

 

 

Cell

 

 

 

 

 

C

 

Cell 1

 

BLACK

A

 

 

 

 

 

 

 

 

 

 

 

 

A

 

K

Electrodes

Internal Cell Assembly

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Configuration

View of Junction Box Head

Coax Cable

Note 1

 

 

 

 

 

 

with Cap Removed

Shield

 

 

 

 

 

 

 

 

 

 

 

 

Cell Assembly Connections

 

Conductivity/Resistivity

 

 

 

 

 

 

 

 

 

 

 

I

II

III

IV V

VI

 

Analyzer

 

GND

 

 

 

 

 

 

4905

-

-

333

- X1

 

Analyzer Input Connections

 

 

 

 

 

 

 

4973 I

4974 -

4908 I

4909 -

II

III

 

IV

 

V

 

 

 

 

333

- X1

-

 

 

 

 

VI VII

II

III

IV

 

V

 

-

 

 

333

- X1

 

 

 

 

 

 

NOTES:

1.For pure water samples in non-conductive (plastic, glass, etc.) piping, ground the black cell electrode lead near the cell. Alternatively, connect to the 9782 ground screw as shown dotted. Do not ground 10, 25, or 50 constant cells.

2.9782C-S0 (only)

Use 22 gage minimum coaxial cable type RG59/U connecting shield to terminal "SH" only.

3.9782C-S0

For cable runs of up to 500 ft., use: 18 gage minimum, three conductor cable.

For cbale runs of 500 - 1000 ft., use: 16 gage minimum, three conductor cable.

9782C-W0 [coax and shield (SH) not used]

For cable runs of up to 500 ft., use: 18 gage minimum, four conductor cable.

For cable runs of 500 - 1000 ft., use: 16 gage minimum, four conductor cable.

4.Cell to analyzer cables are considered low level. Run seperate from high level wiring.

5.If 2 Cells are to be appplied, the same wiring guidelines are applied to Cell 2 as are followed for Cell 1.

Figure 5-2 Installation Diagram-Cat. 4909 Cells with Junction Box Head

Connected to 9782 Conductivity/Resistivity Analyzer

7/99

4909 CPVC Conductivity Cell Insertion/Removal Assembly– Operations Manual

21

Image 29
Contents 70-82-25-19 Rev 7/99 Revision 1- 7/99 Copyright, Notices, and TrademarksRevision Notes AbstractReferences ContactsOrganization Telephone Address Honeywell TAC Voice Contents Platinization and Platinum Black Figures Page 4908 Conductivity Cell IntroductionOverview 31074357 Removal Device Temperature/Pressure* RangeValve NPT Plug Conductivity Cell Conductivity Cell Adapter Set Screw #6-32 Binding Head Page Specifications Specifications and Model Selection GuideLeadwire Integral Automatic Temperature CompensationWeight Model Selection GuideSelection Table VII Options Requirements InstallationLocation and Position ConsiderationsMounting into the Process Prepare AssemblyInitial Prep Insertion Electrical Connections RemovalRED White Green Replacing Removal Device Parts Maintenance and Replacement PartsTo Clean The Cell Voltage and Time Limits for Platinizing Cells Replacement Parts Replacement Parts Platinization and Platinum Black RED Green Direct Cell to Analyzer Installation #2 TempNote 5 Compensator Page Page Industrial Automation and Control