2.0INSTALLATION CONSIDERATIONS
ALiebert authorized representative must perform the initial system
1. !Proper planning will speed unloading, location, and connection of the UPS. Refer to
Figure 8 through Figure 58 and Appendix A - Site Planning Data.
2. Refer to information later in this manual regarding the optional Battery Cabinets and Transformer Cabinets. Observe all battery safety precautions when working on or near the battery.
3. Use the shortest output distribution cable runs possible, consistent with logical equipment arrangements and with allowances for future additions if planned.
4. Recommended ambient operating temperature is 25°C (77°F). Relative humidity must be less than 95%,
5. Even though your Liebert UPS unit is at least 93% efficient, the heat output is substantial. For more specific information, see Appendix A - Site Planning Data. Be sure environmental conditioning systems can accommodate this BTU load, even during utility outages.
6. The routing (inside the facility) to the installation site, as well as the floor at the final equipment location, must be capable of supporting the cabinet weight and the weight of any moving equipment. The modules weigh up to 12,000 pounds. The battery cabinets weigh between 3000 and 4900 pounds. The System Control Cabinets weigh between 1000 and 2550 pounds. Refer to Appendix A - Site Planning Data.
7. Plan the routing to ensure that the unit can move through all aisleways, doorways, and around corners without risking damage. If the modules and batteries must be moved by elevator, check the size of the door openings and the
WARNING
LOCATE CENTER OF GRAVITY SYMBOLS ! AND DETERMINE UNIT WEIGHT BEFORE
HANDLING CABINET.
4 Installation Considerations