PULLEY
BRACKET
PEC STATION PAD
3/8 X 3”
FRAME
FIGURE 7
STEP 7:
•Remove the PULLEY BRACKET, the PEC STATION PAD and two 3/8 X 3” BOLTS from the FRAME. Discard the PULLEY BRACKET. See FIGURE 7.
PEC STATION PAD
3/8 X 3”
18
FRAME
FIGURE 8
STEP 8:
•SECURELY assemble the PEC STATION PAD to the FRAME using two previously removed 3/8 X 3” BOLTS and two 3/8” WASHERS (18). See FIGURE 8.
| 1/2 |
| 1/2 |
| 1/2 |
| 1/2 |
| 1/2 |
|
| 1/2 |
0 | 1 | 2 | 3 | 4 | 5 | 6 |
20