ParaBody 425103 manual Cable has been routed

Page 23

94

93

93

89 1/2 X 4-1/2”

26

6

 

25

53

FIGURE 27

 

STEP 27

SECURELY assemble the BEARING HOUSING (6) and the CENTER PULLEY BRACKET (26) to the FRONT UPRIGHT (25) using two 1/2 X 4-1/2” BOLTS (89) , four 1/2” WASHERS (93), and two 1/2" LOCK NUTS (94). See FIGURE 27.

Attach two 1 X 1" GUIDES (53) to the ANGLE on the UNDERSIDE of the BEARING HOUSING (6). See FIGURE 27.

 

 

84 3/8 X 2”

 

STEP 28

 

 

 

 

91 45

 

LOOSELY assemble two 3-1/2” PULLEYS (42) to the

 

 

42

CENTER PULLEY BRACKET (26) using two 3/8 X 2”

 

 

 

BOLTS (84), two 2-3/8” L-BRACKETS (45), four 3/8”

 

 

 

 

WASHERS (91), and two 3/8” LOCK NUTS (92). See

 

 

 

 

FIGURE28.

 

 

 

 

 

 

(NOTE: This connection wil be tightened after the

 

 

26

 

cable has been routed.)

 

 

 

 

91

 

 

 

 

 

 

92

 

 

 

FIGURE 28

 

 

 

 

 

 

1/2

1/2

1/2

3

1/2

1/2

1/2

0

1

2

4

5

6

 

 

 

24

 

 

 

Image 23
Contents Home GYM Important Notes Parts List Step 87 1/2 X 84 3/8 X Step 88 1/2 X 85 3/8 X 2-3/4 Step 106 Step Step Step Step LOW Height NUT PUSH/PULL Underside Justment Tube 22 to rotate freely LOW Height NUT Detail Button Cable has been routed 90 1/2 X 3-1/2 Post Detail Support Tube to rotate freely Page 102 Cable Installation 100 LAT PEC Cable Detail 83 3/8 Press Cable LAT LEG EXT Cable LAT Press Cable LEG EXT 105 96 3/8 X 1 Button Head CAP Screw Step