ParaBody 425103 manual 105

Page 38

STEP 45

If upon completion of assembly, the HEAD PLATE (72) does not sit on top of the first WEIGHT PLATE (105), push the HEAD PLATE (72) down, insert the WEIGHT STACK PIN (75) and perform several repetitions at the press station. This will relax the cable system and prevent the HEAD PLATE (72) from lifting up.

If after completing previous step, the HEAD PLATE (72) still does not sit on top of the first WEIGHT PLATE (105) or if there is excess slack in the cable system, adjust the two threaded ends of the HEAD PLATE CABLE (102) accordingly and retighten the jam nuts.

If there is excess slack in the AB or PEC DEC cable system, adjust the threaded end of the AB CABLE (103) accordingly and re- tighten the jam nut.

102

72

105

75

FIGURE 45

2”

32

31

31

FIGURE 46

STEP 46

Apply pressure to the bottom of one SHROUD (31) where thw “V” groove is and carefuly remove the weight stack opening on the plastic SHROUD (31) as shown in FIGURE 46. This will be the front SHROUD (31).

Apply one PARABODY 425 SERIOUS STEEL LABEL (32) to the front SHROUD (31) approximately 2” from the top as shown in FIGURE 46.

38

Image 38
Contents Home GYM Important Notes Parts List Step 87 1/2 X 84 3/8 X Step 88 1/2 X 85 3/8 X 2-3/4 Step 106 Step Step Step Step LOW Height NUT PUSH/PULL Underside Justment Tube 22 to rotate freely LOW Height NUT Detail Button Cable has been routed 90 1/2 X 3-1/2 Post Detail Support Tube to rotate freely Page 102 Cable Installation 100 LAT PEC Cable Detail 83 3/8 Press Cable LAT LEG EXT Cable LAT Press Cable LEG EXT 105 96 3/8 X 1 Button Head CAP Screw Step