Life Fitness SM51 manual Adjustable Crossover Cable Routing, Adjustable crossover cable routing

Page 13

SM51 Unpacking & Assembly Instructions

ADJUSTABLE CROSSOVER CABLE ROUTING

Once you’ve removed the pulleys as described previously, route the adjustable crossover cable on the 4-stack cell as shown in Figure 17. The crossover cable is routed at the factory on the 1 stack cube (shown at right in Figure 17).

Figure 17. Adjustable crossover cable routing.

13

Image 13
Contents M051-K50-B112 Assembly Time Materials and Tools Required for AssemblyUnpacking Parts box contentsSM51 main components seats and cables removed for clarity AssemblySet the weight stack cells Configuration for 2-3/4 and 3 bolts Configuration for 6 bolts Putting on the weight stacks SM51 Unpacking & Assembly Instructions Mount the benches to the frame Bolt the benches to the frame Removing the pulley bolts Installing the CablesAdjustable crossover cable routing Adjustable Crossover Cable RoutingLOW ROW Cable Routing Adjustable crossover cable end detailLAT Pulldown Cable Routing Screw the cable into the weight stackTricep pushdown cable routing Tricep Pushdown Cable RoutingHardware Hardware . Assembly PartsHardware . Rubber cap Hardware . Cables Hardware . Cable jam nutHardware . Top assemblies Hardware . Floating pulleys Hardware . Weight stack rubber bumpersParts List Hardware installed InstalledPulley hardware Floating pulley