SM51 Unpacking & Assembly Instructions
Bolt the cable to the weight stacks as shown in Figure 20. Thread the 7/8” nut up on the cable bolt as shown at left. Screw the bolt down into the weight stack as shown at right. Tighten the bolt with a 7/8” combination wrench.
Figure 20. Screw the cable into the weight stack.
LAT PULLDOWN CABLE ROUTING
Route the lat pulldown cable as shown in Figure 21. Screw the cable into the weight stack as shown previously in Figure 20.
Figure 21. Lat pulldown cable routing.
15