Life Fitness SM51 manual Materials and Tools Required for Assembly, Assembly Time

Page 2

SM51 Unpacking & Assembly Instructions

The SM51 comes partially assembled. Follow the steps below to complete the assembly.

WARNING: COMPONENTS OF THE SM51 ARE LARGE AND HEAVY. USE CAUTION WHEN ASSEMBLING THIS MACHINE.

MATERIALS AND TOOLS REQUIRED FOR ASSEMBLY

1/2”, 3/8”, 5/8” & 9/16”

1/8”

5/8” & 9/16”

Pinch bar

Socket wrench

Hex key wrench

Combination wrench

 

You will also need a ladder and a piano dolly to lift and position the weight stacks.

ASSEMBLY TIME

Two people can accomplish this assembly in approximately 2 hours.

2

Image 2
Contents M051-K50-B112 Materials and Tools Required for Assembly Assembly TimeParts box contents UnpackingAssembly SM51 main components seats and cables removed for claritySet the weight stack cells Configuration for 2-3/4 and 3 bolts Configuration for 6 bolts Putting on the weight stacks SM51 Unpacking & Assembly Instructions Mount the benches to the frame Bolt the benches to the frame Installing the Cables Removing the pulley boltsAdjustable Crossover Cable Routing Adjustable crossover cable routingAdjustable crossover cable end detail LOW ROW Cable RoutingScrew the cable into the weight stack LAT Pulldown Cable RoutingTricep Pushdown Cable Routing Tricep pushdown cable routingHardware . Assembly Parts HardwareHardware . Rubber cap Hardware . Cable jam nut Hardware . CablesHardware . Top assemblies Hardware . Weight stack rubber bumpers Hardware . Floating pulleysParts List Pulley hardware InstalledHardware installed Floating pulley