Life Fitness SM51 manual Set the weight stack cells

Page 5

SM51 Unpacking & Assembly Instructions

Figure 3. Set the weight stack cells.

2.Bolt on the teardrop pulleys above the benches (see Figure 4) on the 4 stack cell using two 3/8” x 2-3/4” hex head bolts (used to bolt the cross beam to the cross members and the adjustable pulley tops to the top beams). Include the 3/8” flat washer, end cap washers, end caps and 3/8” Nyloc (locknut). Use the bolt configuration shown in Figure 5. You may wish to use a pinch bar to align the bolt holes.

Figure 4. Bolt on the teardrop pulleys.

5

Image 5
Contents M051-K50-B112 Assembly Time Materials and Tools Required for AssemblyUnpacking Parts box contentsSM51 main components seats and cables removed for clarity AssemblySet the weight stack cells Configuration for 2-3/4 and 3 bolts Configuration for 6 bolts Putting on the weight stacks SM51 Unpacking & Assembly Instructions Mount the benches to the frame Bolt the benches to the frame Removing the pulley bolts Installing the CablesAdjustable crossover cable routing Adjustable Crossover Cable RoutingLOW ROW Cable Routing Adjustable crossover cable end detailLAT Pulldown Cable Routing Screw the cable into the weight stackTricep pushdown cable routing Tricep Pushdown Cable RoutingHardware Hardware . Assembly PartsHardware . Rubber cap Hardware . Cables Hardware . Cable jam nutHardware . Top assemblies Hardware . Floating pulleys Hardware . Weight stack rubber bumpersParts List Hardware installed InstalledPulley hardware Floating pulley