SM51 Unpacking & Assembly Instructions
4.Mount the 56” lat top (part T from HARDWARE section) to the
Figure 7. Configuration for 6” bolts.
Figure 8. Mount the weight stacks.
5.Mount the weight stacks to the 4-stack cell. To do this:
A.Remove the tricep back rest bolts using a 9/16” socket and combination wrench (see Figure 9).
B.Unbolt the top plate and remove the guide rods using a 9/16” socket and combination wrench (see Figure 9).
7