Life Fitness SM42 manual LAT Pulldown Cable Routing

Page 14

SM42 Unpacking & Assembly Instructions

Figure 18. Adjustable crossover cable end detail.

Using a 7/8” wrench, tighten the jam nut onto the adjustable pulley threads as shown in Figure 18. Place a rubber cap on the top of the cable as shown in Figure 18 (right).

LAT PULLDOWN CABLE ROUTING

Route the lat pulldown cable as shown in Figure 19.

Figure 19. Lat pulldown cable routing.

14

Image 14
Contents M051-K50-A142 Materials and Tools Required for Assembly Assembly TimeParts box contents UnpackingAssembly SM42 main componentsSet the weight stack cells Configuration for 2-3/4 and 3 bolts Configuration for 6 bolts Putting on the weight stacks SM42 Unpacking & Assembly Instructions X 3 Bolt the benches to the frame Installing the Cables Removing the pulley boltsAdjustable Crossover Cable Routing LAT Pulldown Cable Routing Tricep Pushdown Cable Routing Hardware . Assembly Parts HardwareHardware . Rubber cap Hardware . Cable jam nut Hardware . CablesHardware . Top assemblies Hardware . Weight stack rubber bumpers Hardware . Floating pulleysBolt hardware Main componentsCables, caps & nuts Pulleys and bumpersPulley hardware InstalledHardware installed Floating pulley