Life Fitness SM42 manual Set the weight stack cells

Page 5

SM42 Unpacking & Assembly Instructions

Figure 3. Set the weight stack cells.

2.Bolt on the teardrop pulleys above the benches (see Figure 4) on the 3 stack cell using two 3/8” x 2-3/4” hex head bolts (used to bolt the cross beam to the cross members and the adjustable pulley tops to the top beams). Include the 3/8” flat washer, end cap washers, end caps and 3/8” Nyloc (locknut). Use the bolt configuration shown in Figure 5. You may wish to use a pinch bar to align the bolt holes.

3/8” x 2-3/4” (2)

Figure 4. Bolt on the teardrop pulleys.

5

Image 5
Contents M051-K50-A142 Assembly Time Materials and Tools Required for AssemblyUnpacking Parts box contentsSM42 main components AssemblySet the weight stack cells Configuration for 2-3/4 and 3 bolts Configuration for 6 bolts Putting on the weight stacks SM42 Unpacking & Assembly Instructions X 3 Bolt the benches to the frame Removing the pulley bolts Installing the CablesAdjustable Crossover Cable Routing LAT Pulldown Cable Routing Tricep Pushdown Cable Routing Hardware Hardware . Assembly PartsHardware . Rubber cap Hardware . Cables Hardware . Cable jam nutHardware . Top assemblies Hardware . Floating pulleys Hardware . Weight stack rubber bumpersCables, caps & nuts Main componentsBolt hardware Pulleys and bumpersHardware installed InstalledPulley hardware Floating pulley