Life Fitness manual Assembly, SM42 main components

Page 4

SM42 Unpacking & Assembly Instructions

ASSEMBLY

Figure 2 shows an assembled SM42.

 

4

 

1

5

6

 

 

8

2

7

3

Figure 2. SM42 main components.

1.

1 stack cell

5.

Lat top

2.

4 stack cell

6.

Tricep top

3.

Lat bench

7.

300 lb. Weight stacks (1)

4.

Connecting beam

8.

190 lb. Weight stacks (3)

1.Place the two weight “cells” in their final resting spots. The cells will be approximately 11’4” apart as shown in Figure 3.

4

Image 4
Contents M051-K50-A142 Materials and Tools Required for Assembly Assembly TimeParts box contents UnpackingAssembly SM42 main componentsSet the weight stack cells Configuration for 2-3/4 and 3 bolts Configuration for 6 bolts Putting on the weight stacks SM42 Unpacking & Assembly Instructions X 3 Bolt the benches to the frame Installing the Cables Removing the pulley boltsAdjustable Crossover Cable Routing LAT Pulldown Cable Routing Tricep Pushdown Cable Routing Hardware . Assembly Parts HardwareHardware . Rubber cap Hardware . Cable jam nut Hardware . CablesHardware . Top assemblies Hardware . Weight stack rubber bumpers Hardware . Floating pulleysMain components Cables, caps & nutsBolt hardware Pulleys and bumpersInstalled Hardware installedPulley hardware Floating pulley