Life Fitness SM42 manual Materials and Tools Required for Assembly, Assembly Time

Page 2

SM42 Unpacking & Assembly Instructions

The SM42 comes partially assembled. Follow the steps below to complete the assembly.

WARNING: COMPONENTS OF THE SM42 ARE LARGE AND HEAVY. USE CAUTION WHEN ASSEMBLING THIS MACHINE.

MATERIALS AND TOOLS REQUIRED FOR ASSEMBLY

1/2”, 3/8”, 5/8” & 9/16”

1/8”

5/8” & 9/16”

Pinch bar

Socket wrench

Hex key wrench

Combination wrench

 

You will also need a ladder and a piano dolly to lift and position the weight stacks.

ASSEMBLY TIME

Two people can accomplish this assembly in approximately 2 hours.

2

Image 2
Contents M051-K50-A142 Materials and Tools Required for Assembly Assembly TimeParts box contents UnpackingAssembly SM42 main componentsSet the weight stack cells Configuration for 2-3/4 and 3 bolts Configuration for 6 bolts Putting on the weight stacks SM42 Unpacking & Assembly Instructions X 3 Bolt the benches to the frame Installing the Cables Removing the pulley boltsAdjustable Crossover Cable Routing LAT Pulldown Cable Routing Tricep Pushdown Cable Routing Hardware . Assembly Parts HardwareHardware . Rubber cap Hardware . Cable jam nut Hardware . CablesHardware . Top assemblies Hardware . Weight stack rubber bumpers Hardware . Floating pulleysBolt hardware Main componentsCables, caps & nuts Pulleys and bumpersPulley hardware InstalledHardware installed Floating pulley