Life Fitness SM42 manual Adjustable Crossover Cable Routing

Page 13

SM42 Unpacking & Assembly Instructions

ADJUSTABLE CROSSOVER CABLE ROUTING

Once you’ve removed the pulleys as described previously, route the adjustable crossover cable on the 4-stack cell as shown in Figure 17. The crossover cable is routed at the factory on the 1 stack cube (shown at right in Figure 17).

Figure 17. Adjustable crossover cable routing.

13

Image 13
Contents M051-K50-A142 Assembly Time Materials and Tools Required for AssemblyUnpacking Parts box contentsSM42 main components AssemblySet the weight stack cells Configuration for 2-3/4 and 3 bolts Configuration for 6 bolts Putting on the weight stacks SM42 Unpacking & Assembly Instructions X 3 Bolt the benches to the frame Removing the pulley bolts Installing the CablesAdjustable Crossover Cable Routing LAT Pulldown Cable Routing Tricep Pushdown Cable Routing Hardware Hardware . Assembly PartsHardware . Rubber cap Hardware . Cables Hardware . Cable jam nutHardware . Top assemblies Hardware . Floating pulleys Hardware . Weight stack rubber bumpersCables, caps & nuts Main componentsBolt hardware Pulleys and bumpersHardware installed InstalledPulley hardware Floating pulley