| 42 |
| 92 |
| 98 |
| 91 |
| 84 3/8 X 2” |
FIGURE 40 | 29 |
STEP 40
•Assemble one
26 |
|
98 | 24 |
98 | |
PEC |
|
CABLE |
|
| FIGURE 41 |
STEP 41 |
|
•Slide the ends of the PEC DEC CABLE (98) into the bushings on the PEC CAMS (24) as shown on FIGURE 41.
•Lay the PEC DEC CABLE (98) over the pulleys and under the cable retaining clips in the CENTER PULLEY BRACKET (26) as shown in FIGURE 41. (NOTE: Securely tighten the pulley connections in the CENTER PULLEY BRACKET (26). The cable retaining clips should be at approximately a 45° angle.)
| 1/2 |
| 1/2 |
| 1/2 |
| 1/2 |
| 1/2 |
|
| 1/2 |
0 | 1 | 2 | 3 | 4 | 5 | 6 |
38