Evo Fitness 50551 owner manual TOP Cable Path

Page 17

ASSEMBLY

Step 11:

 

ROUTING THE TOP CABLE:

 

Insert the bolt end of the cable through

 

the slot in the tube (ball outside). Route

ball end

the cable over pulley T1, continue through

pulley T2, down and around pulley T3, up and around pulley T4, down and screw the cable bolt end into the threaded end of the Select Rod (23) at least 7 complete turns.

TOP CABLE (42)

bolt end

assembly instructions

TOP CABLE

T2

PATH

 

 

T1

INSERT CABLE THROUGH

T3

T4

SLOT IN TUBE, LEAVE THE

 

BALL ON THE OUTSIDE

 

T5

FIG-T1

FIG-T3

FIG-T5

FIG-T2

FIG-T4

-17-

Image 17
Contents EVO Sedona Home Gym Before Beginning PreassemblyMajority of the Listed Hardware is Already in Place Parts listMajority of the Listed Hardware is Already PlaceADJ Cable Small Pulley By the Factory Parts diagramInstructions AssemblyStep Assembly instructionsAssembly Assembly instructions Detail TOP View Assembly instructions Bracket Assembly instructions Firmly tighten all fasteners at this time TOP Cable Path TOP CableFIG-C3 Connect Cable Path FIG-C1,C7FIG-C2,C6 FIG-C4,C5FIG-P1,P8 FIG-P3 FIG-P4 FIG-P5,P6 PEC DEC CablePEC DEC Cable Path Routing the Lower Cable Lower CableAssembly instructions Assembly instructions Page Warranty WarrantyImportant Steps Important stepsExercising Target heart rateYour Target Zone Muscle Chart Muscle chartWarm UP Stretching routineCool Down Shoulder Lift Page