ASSEMBLY
Step 13: |
|
|
|
ROUTING THE PEC DEC CABLE: | eyelet end | PEC DEC CABLE (43) | eyelet end |
Attach the eyelet end of the cable to the bracket | PEC DEC CABLE PATH |
| |
on the Right Pec Dec Arm (10) using one 3/8" x |
| ||
|
|
| |
|
|
| |
Nut (94). |
|
|
|
Route the cable around pulley P2, through the |
|
|
| |
slot in the Base Frame (1), around pulley P3, up |
|
|
| |
and around pulley P4, through the hole in the |
|
|
| |
Base Frame (1), down and around pulley P5, |
|
|
| |
through the slot in the Base Frame (1), continue |
|
|
| |
through the slot in the Pec Dec Base Frame (6), |
|
|
| |
around pulley P6, continue around pulley P7. |
|
|
| |
Attach the other eyelet end of the cable to the |
|
|
| |
bracket on the Left Pec Dec Arm (11) using one |
|
| C2 | |
3/8" x |
|
| ||
Nylon Nut (94). |
|
|
|
|
|
|
| P4 | |
|
|
| ||
|
|
|
| P3 |
|
| P8 |
| P1 |
|
| P6 |
|
|
|
| P7 | P2 | P5 |
|
|
|
| |
|
|
|
|
|
| C2 |
|
|
|