Huffy Sports Basketball Systems manual Keep flange pushed down To concrete and leveled

Page 11

5.Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions several times while concrete is curing.

Note A

Make a reference mark here for anti-skid tape.

1" (2.54 cm)

Note B

Keep flange pushed down

to concrete and leveled.

1" (2.54 cm)

SIDE VIEW

IMPORTANT!:

WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP. CONCRETE MUST CURE.

6.After concrete has cured, remove bottom pole section from ground sleeve (4). Place anti-skid tape (6) around the bottom area of bottom pole (see note A).

6

5

Note A

Place top edge of anti-skid tape on mark made in step 5.

4

Note B

Tape prevents the pole from rotating during play.

11

02/04

P/N 21145507

Image 11
Contents Inground System Before YOU Start U.S.1-800-558-5234 and Canada Safety Instructions Warranty Card Parts List See Hardware Identifier Hardware Identifier Bolts & Screws Section a Assemble the Pole TOP Middle FIG. a Keep flange pushed down To concrete and leveled Taped reference marks 02/04 Side Access Section B Assemble the Backboard To Elevator Tubes 21145507 02/04 02/04 21145507 02/04 Surface of acrylic 21145507 02/04 Section C Attach the BACKBOARD/ELEVATOR To Pole System 21145507 02/04 USE EYE Protection When Installing Springs Install clips Insert net into bottom of clip as shown Use wedge to tap cap of ground sleeve until tight 24A 10 ft 05 m