7. Install ground sleeve cap (5) onto | 8. | Stack upper pole section (1) to bottom | ||
bottom pole section (1). Stack and | pole assembly and continue bouncing | |||
bounce bottom (3) and middle (2) |
| until top pole (1) no longer move toward | ||
pole sections together. Bounce |
| taped reference mark. | ||
pole sections together until middle |
|
|
|
|
section no longer moves toward |
|
|
|
|
taped reference mark on bottom |
|
|
|
|
|
| 1 |
| |
pole. |
|
|
| |
|
|
|
| |
|
|
|
|
2
Taped reference marks
5
3
WOOD SCRAP
(NOT SUPPLIED)
IMPORTANT!:
POLE SECTIONS SHOULD
HAVE A
MINIMUM OVERLAP.
5
WOOD SCRAP
(NOT SUPPLIED)
9.Install pole mount bracket (7), bracket reinforcement (44) with carriage bolts
(8) as shown. Tighten flange nuts (9) completely.
7
9
9
1
44
8
8
FRONT SIDE