Spalding M867SF12 manual Install net 4 to rim as shown

Page 13

12.

Install net (4) to rim as shown.

1. 2.

3.

4.

13.

Apply name plate stickers (15) to lower yoke as shown.

 

15

15

13

08/06

ID# M867SF12

Image 13
Contents In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Mounting plate 2 and secure as shown Install threaded ends of J-bolts 19 through holesBuild drainage hill Side ViewAreas shown Insert bushings 26 and 27 intoMounting plate 2 as shown Playing SurfaceCompleted Assembly Yoke Placement Attach backboard 11 to upper and lower Using TWO people to hold the boardYokes First attach board 11 to upper yokeRim Assembly Apply name plate stickers 15 to lower yoke as shown Install net 4 to rim as shownPlayingsurface Remove cotter pin 8, and pull out pin 13. This will allow After pole has been secured to plate 2 loosen nutFeet 05 m Limited Lifetime Warranty